Chapter 15.12
DEVELOPMENT FEES
Sections:
15.12.010 General fee structure.
15.12.010 General fee structure.
The community development department is authorized to charge and collect the following fees:
|
Type of Activity |
Fee |
|
Land Use Review Fees |
|
|
Administrative Approval (bed and breakfast, accessory dwelling unit, or similar request) |
$250.00 |
|
Annexation |
|
|
Under 10 acres |
$250.00 |
|
Over 10 acres |
$750.00 |
|
Appeals (quasi-judicial) |
|
|
For activity that requires a hearing for the primary project action |
$250.00 |
|
For activity that would not have required a hearing for the primary action |
$500.00 |
|
Appeals (administrative) |
$250.00 |
|
Boundary Line Adjustment (up to two lots) |
$500.00 |
|
Comprehensive Plan Amendment |
|
|
Map amendment with rezone (under 5 acres) |
$2,500 |
|
Map amendment with rezone (over 5 acres) |
$5,000 |
|
Text amendment |
$500.00 |
|
Conditional Use Permit (administrative) |
|
|
Residential |
$1,000 + $100.00 for each unit |
|
Group residence or communication facility |
$2,500 |
|
Commercial (including RV park, churches) |
$3,500 |
|
Conditional Use Permit (public hearing) |
Administrative fee + $1,500 |
|
Critical Areas Review |
|
|
Under 0.50 acre |
$250.00 |
|
0.51 – 2 acres |
$500.00 (+ peer review costs if applicable) |
|
2.01 – 10 acres |
$1,500 (+ peer review costs if applicable) |
|
10.01 – 20 acres |
$2,500 (+ peer review costs if applicable) |
|
20.01 – 50 acres |
$3,500 (+ peer review costs if applicable) |
|
50.01+ acres |
$5,000 (+ peer review costs if applicable) |
|
EIS Preparation and Review |
All direct, indirect costs and materials ($135.00/ hour for staff time) |
|
Home Occupation (administrative approval) |
$50.00 |
|
Lot Status Determination |
|
|
Readily verifiable with documents submitted by applicant |
$50.00 |
|
Requires research and detailed document evaluation and confirmation |
$200.00 |
|
Minor Modifications (to subdivision, site plan) |
$350.00 |
|
Miscellaneous Reviews Not Otherwise Listed |
$120.00/hour |
|
Preapplication Review Fee |
$350.00 (fee will be credited upon application submittal if filed within 90 days of the preapplication meeting) |
|
Rezone |
|
|
Commercial (plus site plan charges if combined with project level review) |
$2,500 |
|
PRD and mixed use overlay (plus site plan or subdivision charges) |
$2,500 |
|
SEPA Checklist |
|
|
Residential (1 – 9 lots or dwelling units) |
$350.00 |
|
Residential (10 – 20 lots or dwelling units) |
$500.00 |
|
Residential (21 – 100 lots) |
$1,000 |
|
Residential (greater than 100 lots or units) |
$1,500 |
|
Commercial/Industrial (0 to 2 acres) |
$350.00 |
|
Commercial/Industrial (2 to 20 acres) |
$750.00 |
|
Commercial/Industrial (greater than 20 acres) |
$1,500 |
|
Shoreline Permit (administrative review) |
$1,000 |
|
Shoreline Permit, Shoreline Conditional Use Permit, or Shoreline Variance Permit with public hearing |
$5,000 |
|
Site Plan Review (commercial, multifamily, PRD, master plan) |
|
|
Under 0.50 acre |
$500.00 + $50.00/lot or unit |
|
0.51 – 2 acres |
$750.00 + $50.00/lot or unit |
|
2.01 – 10 acres |
$2,000 + $50.00/lot or unit |
|
10.01 – 20 acres |
$5,000 + $45.00/lot or unit |
|
20.01+ acres |
$7,500 + $40.00/lot or unit |
|
Site/Subdivision Plan Review (with utility availability for county projects) |
|
|
Under 0.50 acre |
$500.00 |
|
0.51 – 2 acres |
$750.00 |
|
2.01 – 10 acres |
$2,000 |
|
10.01+ acres |
$5,000 |
|
Subdivisions |
|
|
Preliminary binding site plan (commercial, industrial) |
$5,000 + $100.00/lot or unit |
|
Preliminary plat |
$5,000 + $100.00/lot or unit |
|
Preliminary short plat |
$3,000 + $100.00/lot or unit |
|
Final binding site plan, plat or short plat |
$1,000 + $100.00/lot or unit |
|
Subdivision Requests (time extension, amendment) |
$200.00 |
|
Temporary Use Permit |
$50.00 |
|
Variance (quasi-judicial decision – zoning, utility) |
$500.00 |
|
Zoning Code Text Amendment |
$500.00 |
|
Fast-Track Overtime (when authorized by both the department and applicant, for project reviews prioritized on overtime basis) |
$165.00/hour for overtime worked, in addition to regular project review fees |
|
|
|
|
Engineering Review and Construction Inspection Fees |
|
|
Engineering Construction Plan Review |
|
|
Residential (full plan sets – roads, drainage, utilities) |
$225.00/lot or unit (for duplex or condominium projects), $2,000 minimum for first two reviews; $120.00/hour for each subsequent review |
|
Residential (partial construction review – i.e., utilities, grading) |
$100.00/lot or unit (for duplex or condominium projects), $1,000 minimum for first two reviews |
|
Multiple Residential/Commercial/Industrial |
$250.00 administrative base fee + $135.00/hour |
|
Engineering, Design and Development Standards Modifications/Variances (administrative) |
$250.00 |
|
Miscellaneous Reviews Not Otherwise Listed, and hourly rate from January 1, 2005 for projects initiated prior to 2005 (prior rates charged for hours worked prior to 2005) |
$120.00/hour |
|
Fast-Track Overtime (when authorized by both the department and applicant, for project reviews prioritized on overtime basis) |
$165.00/hour for overtime worked, in addition to regular project review fees |
|
|
|
|
Construction Inspection Fees |
|
|
Security for performance/security for maintenance fee |
$20.00/lot or unit, with a minimum amount being $250.00 |
|
Inspection for water, sewer, storm, street improvements associated with approved residential construction plans |
$250.00/lot or unit (for duplex or condominium projects), $2,000 minimum |
|
Inspection for utilities only (residential) |
$100.00/lot or unit (for duplex or condominium projects), $1,000 minimum |
|
Multiple residential/commercial/ industrial |
$250.00 administrative base fee + $135.00/hour |
|
Right-of-Way Permit |
$250.00 |
|
Miscellaneous Reviews and Inspections Not Otherwise Listed, and hourly rate from January 2005 for projects initiated prior to 2005 (prior rates charged for hours worked prior to 2005) |
$120.00/hour |
|
Fast-Track Overtime (when authorized by both the department and applicant, for project reviews and inspections prioritized on overtime basis) |
$165.00/hour for overtime worked, in addition to regular project inspection fees |
|
|
|
|
School impact fee administrative charge |
$50.00/single-family or duplex, or $100.00/apartment building |
(Ord. 2806 § 2, 2009; Ord. 2785 § 2, 2009; Ord. 2564 § 1, 2005; Ord. 2555 § 1, 2004).