Chapter 18.175
STORMWATER MANAGEMENT

Section:

18.175.010    Stormwater management.

18.175.010 Stormwater management.

Every application for a development project that creates, adds, or replaces any existing impervious surface that meets or exceeds the stormwater treatment threshold of the NPDES permit in force at the time shall be accompanied by a stormwater control plan that meets the criteria in the most recent version of the Contra Costa Clean Water Program Stormwater C.3 Guidebook. Otherwise the application shall comply with Chapter 16.05 CMC, Stormwater Management and Discharge Control. [Ord. 12-4. DC 2012 § 122-503].