Chapter 9.52
LOT LINE ADJUSTMENTS
Sections:
9.52.010 Lot line adjustments.
9.52.010 Lot line adjustments.
A. Lot line adjustments shall comply with Section 66412(d) of the Subdivision Map Act.
B. Application. An application for a lot line adjustment shall be filed with the Community Development Director for his or her examination for conformance to the general plan, applicable specific plans, adopted zoning and building ordinances and the Subdivision Map Act.
C. Required Documents. The following data and material shall be provided with a completed lot line adjustment application:
1. Current title report for each lot involved in the lot line adjustment, showing the legal owners at the time of submittal of the lot line adjustment application and showing any deeds of trust.
2. Exhibit identifying the location of buildings, structures, utility service lines, parking lots and driveways; the location of existing and proposed lot lines; the location of adjacent streets; setback distance from buildings and structures to proposed lot lines.
3. Plat, legal description, and lot closure calculations, signed and stamped by a professional land surveyor or qualified registered civil engineer, for each new lot and the areas to be transferred.
4. Any additional information required by the Community Development Director or City Engineer.
D. Approval. If the Community Development Director finds that the proposed lot line adjustment is in conformance with the general plan, applicable specific plans, the zoning ordinance and building ordinances, the Community Development Director may approve the lot line adjustment. The approved lot line adjustment shall be reflected in a deed, which shall be recorded. A copy of the recorded deed shall be filed with the Community Development Director. Failure to record the lot line adjustment shall be cause for the denial of any project dependent on the lot line adjustment. (Ord. 4-16 § 1 (Exh. A) (part))