Division 5. Standard Drawings
Chapter 5.105
STANDARD DRAWINGS
Sections:
5.105.010 Standard Drawing 1 – Standard Manhole Frame and Cover.
5.105.020 Standard Drawing 2.0 – Standard Sewer Manhole.
5.105.030 Standard Drawing 2.1 – Manhole Repair to Raise Frame and Cover.
5.105.040 Standard Drawing 2.2 – Raise Manhole Cover with HDPE Grade Rings.
5.105.050 Standard Drawing 2.3 – Raise Manhole Cover with Concrete Grade Rings.
5.105.060 Standard Drawing 3 – Standard 6 Inch Rodding Inlet.
5.105.070 Standard Drawing 4 – Typical Trench Section.
5.105.080 Standard Drawing 5 – Typical Side Sewer Details.
5.105.090 Standard Drawing 6 – Standard Cleanout and Backwater Prevention Device.
5.105.100 Standard Drawing 7 – Backwater Check Valve and Shutoff System.
5.105.110 Standard Drawing 8 – Main Sewer Protection Above Utility Crossing.
5.105.120 Standard Drawing 9 – Main Sewer Protection Below Utility Crossing.
5.105.130 Standard Drawing 10 – Side Sewer Protection Above Utility Crossing.
5.105.140 Standard Drawing 11 – Side Sewer Protection Below Utility Crossing.
5.105.150 Standard Drawing 12 – Side Sewer Reconstruction at Utility Crossing.
5.105.160 Standard Drawing 13 – Standard Concrete Pipe Protection.
5.105.170 Standard Drawing 14 – Force Main Valve.
5.105.180 Standard Drawing 15 – Standard Redwood Check Board.
5.105.190 Standard Drawing 16 – Standard Rip-Rap Installation.
5.105.200 Standard Drawing 17 – Residential Sewage Pumping System.
5.105.210 Standard Drawing 18 – Allowable Leakage Chart Water Test.
5.105.010 Standard Drawing 1 – Standard Manhole Frame and Cover.
[Ord. 2014-2 (Att. Part E).]
5.105.020 Standard Drawing 2.0 – Standard Sewer Manhole.
[Ord. 2014-2 (Att. Part E).]
5.105.030 Standard Drawing 2.1 – Manhole Repair to Raise Frame and Cover.
[Ord. 2014-2 (Att. Part E).]
5.105.040 Standard Drawing 2.2 – Raise Manhole Cover with HDPE Grade Rings.
[Ord. 2014-2 (Att. Part E).]
5.105.050 Standard Drawing 2.3 – Raise Manhole Cover with Concrete Grade Rings.
[Ord. 2014-2 (Att. Part E).]
5.105.060 Standard Drawing 3 – Standard 6 Inch Rodding Inlet.
[Ord. 2014-2 (Att. Part E).]
5.105.070 Standard Drawing 4 – Typical Trench Section.
[Ord. 2014-2 (Att. Part E).]
5.105.080 Standard Drawing 5 – Typical Side Sewer Details.
[Ord. 2014-2 (Att. Part E).]
5.105.090 Standard Drawing 6 – Standard Cleanout and Backwater Prevention Device.
[Ord. 2014-2 (Att. Part E).]
5.105.100 Standard Drawing 7 – Backwater Check Valve and Shutoff System.
[Ord. 2014-2 (Att. Part E).]
5.105.110 Standard Drawing 8 – Main Sewer Protection Above Utility Crossing.
[Ord. 2014-2 (Att. Part E).]
5.105.120 Standard Drawing 9 – Main Sewer Protection Below Utility Crossing.
[Ord. 2014-2 (Att. Part E).]
5.105.130 Standard Drawing 10 – Side Sewer Protection Above Utility Crossing.
[Ord. 2014-2 (Att. Part E).]
5.105.140 Standard Drawing 11 – Side Sewer Protection Below Utility Crossing.
[Ord. 2014-2 (Att. Part E).]
5.105.150 Standard Drawing 12 – Side Sewer Reconstruction at Utility Crossing.
[Ord. 2014-2 (Att. Part E).]
5.105.160 Standard Drawing 13 – Standard Concrete Pipe Protection.
[Ord. 2014-2 (Att. Part E).]
5.105.170 Standard Drawing 14 – Force Main Valve.
[Ord. 2014-2 (Att. Part E).]
5.105.180 Standard Drawing 15 – Standard Redwood Check Board.
[Ord. 2014-2 (Att. Part E).]
5.105.190 Standard Drawing 16 – Standard Rip-Rap Installation.
[Ord. 2014-2 (Att. Part E).]
5.105.200 Standard Drawing 17 – Residential Sewage Pumping System.
[Ord. 2014-2 (Att. Part E).]
5.105.210 Standard Drawing 18 – Allowable Leakage Chart Water Test.
[Ord. 2014-2 (Att. Part E).]