Title 8
PUBLIC WORKS

Chapters:

8.05    Water Service

8.10    Backflow and Cross-Connection Control Program

8.15    Reserved

8.20    Municipal Sanitary Sewer System

8.25    Street Excavations

8.30    Undergrounding of Utilities

8.35    Telecommunications Infrastructure

8.40    Electrical Wires on El Camino Real

8.45    Water Conservation

8.50    Flood Damage Prevention

8.55    Maintenance of Sidewalks

8.60    City of Millbrae Tree Protection and Urban Forestry Program

8.65    Synthetic Grass and Artificial Turf

8.70    Storm Water Management and Discharge Control

8.75    Permit Required for Parklets