Chapter 16.12
GENERAL PROVISIONS

Sections:

16.12.010    Filing requirements to be fulfilled.

16.12.010 Filing requirements to be fulfilled.

A.    No tentative map shall be considered as filed with the city until all of the fees and charges required by the city as pertains to the subdivision of land have been paid, and all applicable requirements of this code have been fulfilled. No tentative map shall be accepted for filing if the map is inconsistent with the general plan unless accompanied by a general plan amendment concurrently and time limits with regards to tentative maps as stated in the Subdivision Map Act are waived by the subdivider.

B.    A final subdivision map or parcel map shall not be considered as filed until all fees, bonds and deposits then due have been made, all corrections have been made as required by the city engineer to the maps and improvement plans, if any, and the approval of a tentative subdivision or tentative parcel map. Such standards are set forth in the Manual of Standard Specifications as maintained for the city by the city engineer. (Ord. 508 § 2 (part), 1993).