Chapter 16.90
CONSTRUCTION PERMIT FEES

Sections:

16.90.010    Intent.

16.90.020    Computation of construction permit fees.

16.90.030    Repealed.

16.90.010 Intent.

It is the intent of the city council to group the fees required for various permits associated with the construction process into one fee schedule that is adopted by resolution of the city council, as amended from time to time. [Ord. 6-2010 § 1; adopted during 2008 codification; SCC 686 § 8, 1987].

16.90.020 Computation of construction permit fees.

The value to be used in computing the permit fee shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems, and any other permanent equipment. [Ord. 6-2010 § 2; adopted during 2008 codification; SCC 686 § 8, 1987].

16.90.030 Fee schedule.

Repealed by Ord. 6-2010. [Ord. 2-2010 § 1, 2010; Ord. 38-2007 § 1 (Exh. 1(A)); Ord. 7-2007 § 2; Ord. 5-2004 § 1].