Chapter 15.68
JOB SITE RECYCLING

Sections:

15.68.010    Procedures to apply for project approval or permit.

15.68.010 Procedures to apply for project approval or permit.

A.    Applicant shall supply information on a city-provided document entitled, “Job Site Salvage, Recycling, Re-use and Disposal Statement,” including, but not limited to, the following:

1.    Location of project;

2.    Name and phone number(s) of on-site manager(s);

3.    Name(s) of subcontractors;

4.    Identification of kind(s), and estimates of quantity and weight, of materials that can be salvaged, reused or recycled.

B.    Applicant shall notify subcontractors of the city’s intent and requirements.

C.    Applicant shall track the final destination for salvageable, recyclable and reusable materials, and for materials disposed of through transportation to a landfill, whether self-haul or otherwise; applicant shall provide totals in these categories to the city within five working days of the completion of the project; if the project takes more than nine months to complete, city staff may obtain subtotals to that point from the applicant.

Where possible, figures on materials shall be expressed in tonnages, unless otherwise specified by the applicant and agreed to by the city’s representative.

These requirements shall be in effect if an applicant is demolishing, and/or constructing, and/or remodeling more than one thousand five hundred (1,500) square feet of space.

Applicant shall comply with the above guidelines or Sections 4.408 and 5.408 of the 2019 California Green Building Standards Code, whichever is more stringent. (Ord. 2021-03 § 5 (Exh. B))