6.110A.020 Development engineering plan review fees.
Fees for those final construction plan review activities included in Table 6.110A.020 shall be collected prior to processing the application:
Section |
Activity |
Fee |
Issuance Fee |
||||
---|---|---|---|---|---|---|---|
1 |
|
|
|
Preliminary Engineering Fees |
|
|
|
|
A |
|
|
Appeals to Hearing Examiner |
414 |
53 |
|
|
B |
|
|
Columbia River Gorge(2) |
Hourly rate; initial deposit $200(3) |
53 |
|
|
C |
|
|
Conditional Use Permit(4) |
|
|
|
|
|
|
|
|
Engineering review |
1,800 |
53 |
|
D |
|
|
Continuance of Hearing—Applicant Initiated for Engineering Issues (in addition to planning fee) |
912 |
n/a |
|
|
E |
|
|
Critical Aquifer Recharge Area Permit (CARA)—Type 1, 2, and 3 Site Plan Review |
900 |
53 |
|
|
F |
|
|
Floodplain Inquiry |
291 |
53 |
|
|
G |
|
|
Geological Hazard |
|
|
|
|
|
|
|
|
Preliminary engineering review |
483 |
53 |
|
H |
|
|
Home Business—All Major and Minor Types(2) |
Hourly rate; initial deposit $200(3) |
53 |
|
|
I |
|
|
Legal Lot Determination(2) |
Hourly rate; initial deposit $200(3) |
53 |
|
|
J |
|
|
Master Plan |
|
|
|
|
|
|
|
|
Engineering review for stand alone master plans |
Hourly rate; initial deposit $200(3) |
94 |
|
|
|
|
|
Maximum fee = $10,000 |
||
|
K |
|
|
Plat Alterations(2) |
Hourly rate; initial deposit $200(3) |
53 |
|
|
L |
|
|
Post Decision Reviews (Type 1, 2, and 3) |
|
|
|
|
|
I |
|
|
Engineering review |
1,250 |
53 |
|
|
II |
|
|
Major change to technical design |
1/2 regular fee |
53 |
|
M |
|
|
Pre-Application Conference (All Types) |
|
|
|
|
|
I |
|
|
Pre-application conference |
1,405 |
94 |
|
|
II |
|
|
Pre-application waiver request |
38 |
n/a |
|
N |
|
|
Road Modification—Transportation |
|
|
|
|
|
I |
|
|
Technical road modification |
1,200 |
53 |
|
|
II |
|
|
Major road modification |
1,559 |
53 |
|
|
III |
|
|
Minor road deviation—Stand alone only(5) |
250 |
53 |
|
O |
|
|
Short Plat(6) |
|
|
|
|
|
|
|
|
Engineering review |
2,108 |
94 |
|
P |
|
|
Site Plan(6) |
|
|
|
|
|
I |
|
|
Types 1, 2, and 3—Engineering review |
2,743 |
94 |
|
|
II |
|
|
Unoccupied commercial and utility structures(7) |
601 |
94 |
|
|
III |
|
|
Highway 99 sub-area reviews |
Standard preliminary engineering fees plus 25% |
n/a |
|
Q |
|
|
Site Plan Review—Fast Lane Permitting |
|
|
|
|
|
|
|
|
Program for reduced time lines for site plan review |
Site plan review fee |
n/a |
|
R |
|
|
60-Day Review |
Standard preliminary and final engineering fees |
n/a |
|
|
S |
|
|
Subdivision (all sizes)(6) |
|
|
|
|
|
|
|
|
Engineering review |
3,757 |
94 |
|
T |
|
|
Variance |
|
|
|
|
|
I |
|
|
Stormwater (All variance types)(8) |
1,207 |
53 |
|
|
II |
|
|
Administrative land use (All land use types)(9) |
575 |
53 |
2 |
|
|
|
Final Engineering Fees |
|
|
|
|
A |
|
|
Drainage Project |
|
|
|
|
|
|
|
|
Stormwater plan review(10) |
828 |
94 |
|
B |
|
|
Floodplain Review |
1,370 |
53 |
|
|
C |
|
|
Geological Hazard |
|
|
|
|
|
|
|
|
Final Engineering Review |
710 |
53 |
|
D |
|
|
Grading and Drainage—Plan Review |
|
|
|
|
|
I |
|
|
Fee based on earthwork volume and stormwater requirements: |
|
|
|
|
|
a |
|
Volume 499 c.y. or less |
|
|
|
|
|
|
|
Basic grading only |
365 |
94 |
|
|
|
|
|
Basic grading and stormwater MR No. 1-5 |
1,193 |
94 |
|
|
|
|
|
Basic grading and stormwater MR No. 1-10 |
3,293 |
94 |
|
|
|
b |
|
Volume 500 to 4,999 c.y. |
|
|
|
|
|
|
|
Basic grading only |
718 |
94 |
|
|
|
|
|
Basic grading and stormwater MR No. 1-5 |
1,546 |
94 |
|
|
|
|
|
Basic grading and stormwater MR No. 1-10 |
3,646 |
94 |
|
|
|
c |
|
Volume 5,000 to 25,000 c.y. |
|
|
|
|
|
|
|
Basic grading only |
1,739 |
94 |
|
|
|
|
|
Basic grading and stormwater MR No. 1-5 |
2,567 |
94 |
|
|
|
|
|
Basic grading and stormwater MR No. 1-10 |
4,667 |
94 |
|
|
|
d |
|
Volume greater than 25,000 c.y. |
|
|
|
|
|
|
|
Basic grading only |
2,000 |
94 |
|
|
|
|
|
Basic grading and stormwater MR No. 1-5 |
2,828 |
94 |
|
|
|
|
|
Basic grading and stormwater MR No. 1-10 |
4,928 |
94 |
|
|
II |
|
|
Fee to extend expired approved grading permit(11) |
50% of original fee |
94 |
|
E |
|
|
Post Plan Approval—Plan Revisions |
|
|
|
|
|
|
|
|
Change design after construction plans approval |
Hourly rate; initial deposit $200(3) |
94 |
|
F |
|
|
Single-Family Residence Stormwater Reviews |
|
|
|
|
|
I |
|
|
Roof and crawlspace drainage review(13) |
345 |
n/a |
|
|
II |
|
|
Stormwater review (MR No. 1-10) |
1,150 |
94 |
|
G |
|
|
Short Plat |
|
|
|
|
|
|
|
|
Engineering Plan Review. Fee based on stormwater requirements: |
|
|
|
|
|
|
|
Basic engineering review |
1,700 |
94 |
|
|
|
|
|
Basic review and stormwater MR No. 1-5 |
2,444 |
94 |
|
|
|
|
|
Basic review and stormwater MR No. 1-10 |
3,800 |
94 |
|
H |
|
|
Site Plan |
|
|
|
|
|
I |
|
|
Types 1, 2, and 3—Final Engineering Review. Fee consists of base fee (based on stormwater complexity) plus disturbed area component Maximum fee = $20,000 |
|
|
|
|
|
a |
|
Base fee (based on stormwater complexity): |
|
|
|
|
|
|
|
Basic engineering review |
1,000 |
94 |
|
|
|
|
|
Basic review and stormwater MR No. 1-5 |
4,200 |
94 |
|
|
|
|
|
Basic review and stormwater MR No. 1-10 |
6,900 |
94 |
|
|
|
b |
|
Plus fee component for square feet of disturbed area(12) |
0.025/s.f. |
n/a |
|
I |
|
|
Subdivision (all sizes) |
|
|
|
|
|
|
|
|
Engineering Plan Review. Fee based on stormwater requirements: |
|
|
|
|
|
|
|
Basic engineering review |
2,900 |
94 |
|
|
|
|
|
Basic review and stormwater MR No. 1-5 |
4,845 |
94 |
|
|
|
|
|
Basic review and stormwater MR No. 1-10 |
6,200 |
94 |
|
J |
|
|
Additional Final Engineering Plan Reviews—Fee Required for Each Review after Third Submittal |
745 |
94 |
Notes:
1 Cost Recovery. Applicant is required to pay consultant’s fees to review specialized designs, including but not limited to structural walls and bridges. County will send the consultant’s bill to the applicant; total amount must be paid before the project is approved or finalized.
2 This fee only applies when development engineering review is requested by community development.
3 The hourly rate fee is calculated using a standard annual hourly rate schedule (by job classification) multiplied by actual staff hours spent on the project. The hourly rate includes salary, benefits, and program overhead. County will send a final itemized billing, less any initial deposit, that must be paid before the project is approved or finalized.
4 Fee is in addition to development engineering fees associated with a land division and/or site plan.
5 There is no fee for minor road deviations requested at the same time as a related land use or engineering application. The minor road deviation stand alone fee applies to applications not associated with a land use or engineering permit.
6 For applications with both a development engineering preliminary land division (PLD) and a preliminary site plan (PSR) that are submitted and processed together resulting in one (1) land use decision, the development engineering fee will equal seventy-five percent (75%) of the combined total of the PLD and PSR cases.
7 The unoccupied commercial and utility structures fee category is only for simple reviews. Projects that trigger stormwater minimum requirements (MR) No. 1-5 or No. 1-10 are required to pay the standard site plan review fee.
8 Fee applies for stormwater variances defined in Section 40.386.030(D).
9 Fee applies for land use variances defined in Section 40.550.020, when engineering review is required.
10 This fee category is only for drainage projects (including the excavation or construction of pipes, culverts, channels, embankments or other flow-altering structures in any stream, stormwater facility, or wetland) that have less than fifty (50) c.y. of earthwork. If the earthwork is fifty (50) c.y. or greater, then the grading and drainage plan review fee category is required.
11 Approvals for grading and drainage plan reviews expire in one (1) year. Extensions are allowed if fees paid before the engineering approval expiration date. Requests to extend engineering approvals after the expiration date may be considered; full engineering fees would apply.
12 Disturbed area is defined in Section 40.386.010.
13 Fee category applies to the review of proposed revisions to a previously approved land division that impacts a single-family residence lot drainage.
(Sec. 3 (Exh. A) of Ord. 2001-12-09; amended by Sec. 1(Exh. A) of Ord. 2002-03-12; amended by Sec. 1 (Exh. A) of Ord. 2002-11-07; amended by Sec. 1 (Exh. A) of Ord. 2004-02-09; amended by Sec. 24 of Ord. 2004-06-11; amended by Ord. 2004-12-02; amended by Ord. 2005-12-01; amended by Sec. 2 of Ord. 2006-05-27; amended by Sec. 1 of Ord. 2007-04-17; amended by Sec. 1 of Ord. 2007-11-13; amended by Sec. 1 of Ord. 2008-02-01; amended by Sec. 1 (Exh. A) of Ord. 2009-06-08; amended by Sec. 1 of Ord. 2011-01-20; amended by Sec. 3 (Exh. C) of Ord. 2011-07-03; amended by Sec. 1 (Exh. 4) of Ord. 2012-02-03; amended by Sec. 1 of Ord. 2015-11-24; amended by Sec. 3 of Ord. 2016-09-03)