Chapter 4.04
ENGINEERING FEES
Sections:
4.04.010 Assessment of fees.
(Ord. 6333 §2; 2004 (reenacted section); Ord. 6333 §1, 2004 (repealed section).
4.04.010 - Assessment of fees
A. Commencing January 1, 2009, the following fee schedule shall be in full force and effect.
Application Type |
|
Plan Check Fees |
Engineering Fee Schedule |
Water Main Extension (For projects outside city limits, fees will increase by 25%) |
$430.00 + $0.45 per lineal foot or part thereafter |
Sewer Main Extension (For projects outside city limits, fees will increase by 25%) |
$430.00 + $0.45 per lineal foot or part thereafter |
Streets |
$430.00 + $0.45 per lineal foot or part thereafter |
Curb and Sidewalk |
$430.00 + $0.45 per lineal foot or part thereafter |
Storm On-Site |
$430.00 + $35.00 per Acre Gross Parcel Area |
Storm Pipe |
$430.00 + $0.45 per lineal foot or part thereafter |
Street Lighting (For projects outside city limits, fees will increase by 25%) |
$430.00 + $0.45 per lineal foot or part thereafter |
Driveway: Commercial |
$645.00 each |
STEP Sewer System: Commercial |
$1,290.00 each |
Sewer Pump Station |
$1,290.00 each |
On-Site Community Septic System (For projects outside city limits, fees will increase by 25%) |
$1,290.00 each |
Traffic Signal |
$1,290.00 each |
Resubmittal Fee |
50% of plan review fee starting with second resubmittal after the initial application |
Application Type |
|
Permit/Inspection Fees |
|
Single Family Residential Site Erosion Control Inspection |
$175.00 each |
Streets and/or Alleys |
$2.15 per linear foot or part thereof |
Curb and/or Walk |
$2.15 per linear foot or part thereof |
Street lighting (For projects outside city limits, fees will increase by 25%) |
$1.50 per linear foot or part thereof |
Driveways: Residential |
$150.00 each |
Driveways: Commercial |
$750.00 each |
Sanitary Sewer Main (For projects outside city limits, fees will increase by 25%) |
$2.95 per linear foot or part thereof plus $1.00 per linear foot for Television Inspection |
STEP Sewer System: Residential (For projects outside city limits, fees will increase by 25%) |
$485.00 each |
STEP Sewer System: Commercial (For projects outside city limits, fees will increase by 25%) |
$970.00 each |
Sewer Pump Station |
$970.00 each |
On-Site Community Septic System (For projects outside city limits, fees will increase by 25%) |
$970.00 each |
Sewer Lateral Connection at Main |
$350.00 each |
Sewer Lateral Connection on Property |
$140.00 each |
Storm Sewer Main |
$2.95 per linear foot or part thereof plus $1.00 per linear foot for Television Inspection |
Storm On-Site System |
$645.00 each |
Water Main (For projects outside city limits, fees will increase by 25%) |
$2.95 per linear foot or part thereof |
Water Connection (New) |
$190.00 each |
Water Purity Sampling Test (Collected for second and subsequent tests for the same system) |
Actual Costs to be Assessed |
Water Main Shutdown (collected for second or subsequent request for the same system) |
Actual Costs to be Assessed |
Traffic Signal |
$1,500.00 each |
Paving of Parking Lots (including re-paving) |
$0.06 per square foot or part thereof |
Right-of-Way Obstruction Permit (No Traffic Control Plan Required) |
$175.00 each |
Right-of-Way Obstruction Permit Right-of-Way Obstruction Permit (Traffic Control Plan Required, and on-site signage, cones, or flaggers needed) |
$535.00 each |
Right-of-Way Excavation/Restoration (Completion Bond Required before Issuance of a Permit equal to 125% value of the work) |
$175.00 each |
Right-of-Way Vacation Request |
$1,850.00 each |
Latecomer Reimbursement Contract |
$1,850.00 + 5% Administrative Fee (based on total cost of the contract) |
UGA City Utility Availability Authorization |
$175.00 each |
Long Term Right-of-Way Use Authorization for Open Right-of-Way Use per Year |
$400.00 per year |
Street Closure Permit for Temporary Moving of Structures or Equipment |
$810.00 each |
Recording Fees for Annexation Agreements, Bills of Sale, Easements, Deeds |
$45.00 |
Recording Fees for Stormwater Maintenance Agreements |
$72.00 |
Private Utilities |
|
Private Utility (power, natural overhead, gas, telecommunications, CATV) (New development of systems): |
New Short Plat - (2-9 Lots) |
Plan Check: $150.00 |
|
Permit Fees: $25.00 |
|
New Long Plat - (10-25 Lots) |
|
Plan Check: $300.00 |
|
Permit Fees: $50.00 |
|
New Long Plat - (26+ Lots) |
|
Plan Check: $500.00 |
|
Permit Fees: $75.00 |
|
New Commercial: |
|
Plan Check: $300.00 |
|
Permit Fees: $50.00 |
|
New R-O-W Utilities (New or Extension) |
|
Plan Check: $250.00 + $0.9 per L.F. |
|
Permit Fees: $25.00 |
|
Repair/Replace Existing |
|
Plan Check: $0.00 |
|
Permit Fees: $25.00 |
|
Resubmittal fees starting with second resubmittal after the initial application |
50% plan check fees |
Tree Protections and Replacement Ordinance Fee Schedule |
|
Tree Plan Review for New Commercial Development |
$1,500.00 each |
Tree Plan Review for New Multi-family Residential Development |
$1,500.00 each |
Tree Plan Review for New Subdivisions - 9 lots and less |
$500.00 each |
Tree Plan Review for New Subdivisions - 10 lots and more |
$1,500.00 + $25.00 per lot |
Tree Plan Field Inspection for New Commercial Development |
$1,500.00 each |
Tree Plan Field Inspection for New Multi-family Residential Development |
$1,500.00 each |
Tree Plan Field Inspection for New Subdivisions - 9 lots and less |
$500.00 each |
Tree Plan Review for New Subdivisions - 10 lots and more |
$1,500.00 + $25.00 per lot |
Tree Plan Review for Tree Trimming by Private Utility |
$200.00 + $0.05 per linear foot of project |
Tree Plan Field Inspection for Tree Trimming by Private Utility |
$200.00 + $0.05 per linear foot of project |
Tree Conversion Option Harvest |
$150.00 per acre, or part thereof, to $3,000.00 maximum |
(Ord. 6610 §1, 2008; Ord. 6447 §1, 2006; Ord. 6428 §1, 2006; Ord. 6333 §2; 2004 (reenacted section); Ord. 6333 §1, 2004 (repealed section); Ord. 6238 §1, 2002; Ord. 6183 §1; 2002; Ord. 6153 §1, 2001; Ord. 6059 §1, 2000; Ord. 5980 §1, 1999; Ord. 5862 §1, 1998; Ord. 5658 §1, 1996; Ord. 5577 §1, 1995; Ord. 5125 §1(part), 1990).