20F.20.50 Site Construction Drawing Review.
20F.20.50-010 Purpose.
The purpose of this section is to establish procedures for reviewing site construction drawings for site improvements. Site construction drawings are engineering documents that are required for improvements to a particular site. (Ord. 2118)
20F.20.50-020 Scope.
This section shall outline the procedures for reviewing site construction drawings for site improvements, when required. (Ord. 2118)
20F.20.50-030 Procedures.
(1) After approval of the site plan, site construction drawings are required to be submitted for review and approval, prior to issuance of a building permit or clearing and grading permit. Site construction drawings may be submitted prior to approval of the site plan.
(2) The submittal requirements for site construction drawings are contained within Appendices 20C-1, 20D-1, 20D-2, 20D-3, 20D-4, and 20D-5, as well as in the site plan approval documents.
(3) No site construction drawings shall be approved unless a site plan has been reviewed and approved by the appropriate decision-making body. Site construction drawings shall be reviewed to determine compliance with the approved site plan.
(4) No site construction drawings shall be approved until the environmental review process required under the State Environmental Policy Act (SEPA) is complete.
(5) No building permit shall be approved without the approval of the site construction drawings. (Ord. 2118)