Chapter 2.85
MISCELLANEOUS PLANNING RELATED FEES AND CHARGES

Sections:

2.85.010    Permit issuance.

2.85.020    Permit fees and charges for planning related permits or amendments.

2.85.030    Permit fees and charges for city services.

2.85.010 Permit issuance.

No planning related permit or amendment specified in this chapter shall be issued or authorized unless or until such costs, charges, fees or expenses shall have been paid in full. (Ord. 2017-01 § 1, 2017; Ord. 2004-4 § 1, 2004).

2.85.020 Permit fees and charges for planning related permits or amendments.

Permit fees shall be established by resolution of the city council, as amended from time to time, for the following actions:

A. For the review of an application to amend the comprehensive plan of the city.

B. For the review of an application for substantial development/conditional use permit under the shoreline master program for the city.

C. For the review of a flood development permit when no other city development or construction permit is required.

D. For the review of an environmental checklist, standalone.

E. For the review of an environmental checklist where public notification is consolidated with other permits or review.

F. For the review of an environmental impact statement:

1. EIS scoping;

2. Draft EIS;

3. Final EIS.

G. For the review of an application for critical areas permit.

H. For the review of an application for subdivision qualified exemption:

1. Application for first action;

2. Fee for each additional related action;

I. For the review of an application for short plat:

1. Two to four lots;

2. Five to nine lots.

J. For the review of an application for long plat:

1. For preliminary plat review;

2. For the review of an application to extend a preliminary plat deadline as allowed by state law;

3. For final plat review:

a. Two to 15 lots;

b. Sixteen to 30 lots;

c. Thirty-one or more lots;

4. For the review of an application to alter/vacate a plat;

5. For the review of an application for a preliminary binding site plan;

6. For the review of final binding site plan per lot.

K. For the review of an application for conditional use permit in the M heavy industrial district.

L. For the review of a use allowed subject to issuance of a special property use permit:

1. Automobile garages and body shops, recycling centers, sewage disposal or treatment plants, outdoor commercial amusements;

2. Auto trailer courts, cemeteries, columbaria and mausoleums, crematories; churches; fraternal organizations; philanthropic institutions; public buildings; public utilities; radio and television broadcasting stations and transmitters; schools and day care centers; kindergarten, nursery schools; convalescent and nursing homes;

3. Home occupations; temporary facilities.

M. For the review of an application for variance.

N. For the review of an application to amend the zoning map:

1. Up to one acre;

2. More than one acre.

O. For the review of a text amendment to the zoning or subdivision ordinance.

P. For the review of an application for similar use determination.

Q. For the review of an application for wireless communication facility (WCF) pursuant to Chapter 17.85 TMC.

R. For consideration of an administrative appeal pursuant to TMC 2.50.080(B).

S. For the reconsideration of a hearing examiner decision pursuant to TMC 2.50.130. (Ord. 2017-01 § 1, 2017; Ord. 2004-4 § 1, 2004).

2.85.030 Permit fees and charges for city services.

Any person or persons seeking to subdivide, develop, or improve land in the city are required to obtain the necessary development authorization and permits and pay the applicable charges and fees therefor. In addition, any city services rendered in connection with land development and subdivisions will require a permit. Permits shall not be issued until such fees are paid. Improvement inspection service fees shall be established by resolution of the city council, as amended from time to time.

A. Improvement Inspection Services.

1. Sewer Main. Inspection of mainline tap, pipe, grade, trench backfill, and service line connections to property, and a one-time video inspection of finished sewer line.

2. Water Main. Includes inspection of mainline tap, pipe, service lines to property, trench backfill, pressure testing, water meter box and setter and one-time bacteriological testing.

3. Storm Drain. Includes inspection of mainline tap, pipe, service lines to property, subgrades and trench backfill.

B. Additional Inspection, Testing or Services.

1. Sewer video inspection;

2. Water main pressure testing;

3. Water main bacterial test;

4. Street sweeping.

C. Improvement plan and specification review for subdivisions, PUDs, short/long plats, and binding site plans: based on the number of lots.

D. Engineering Review Fees. The cost of engineering review associated with any project or permit application shall be borne by applicant. (Ord. 2017-04 §§ 1, 2, 2017; Ord. 2017-01 § 1, 2017; Ord. 2004-4 § 1, 2004).