Chapter 19.34
PUBLIC FACILITIES STANDARD PLANS

Sections:

19.34.010    Compliance with standard plans.

19.34.020    Improvement plans.

19.34.010 Compliance with standard plans.

All public facilities shall be designed and constructed in accordance with the city of Walla Walla standard plans. The standard plans are administrated by the city engineer and are on file in the office of the Department of Public Works. (Ord. 98-42 § 1(part), 1998: Ord. 94-11 § 1(part), 1994).

19.34.020 Improvement plans.

A. Improvement plans shall comply with the city standard plans. The plans shall be done under the direction of a professional engineer (design engineer) registered in the state of Washington and shall bear the engineer’s stamp and signature. All improvement plans shall be reviewed and approved by the city engineer or the city engineer’s representative and shall be stamped “approved” prior to issuance of a permit to construct.

B. Any changes to the approved plans that result during construction shall be shown on as-constructed or as-built plans provided by the developer and marked “Record Drawings” by the design engineer. Record drawings shall be submitted in such number and format as requested by the department, prepared in accordance with Chapter 19.40, Table of Required Information. (Ord. 2008-24 § 9, 2008: Ord. 98-42 § 1(part), 1998: Ord. 94-11 § 1(part), 1994).