Chapter 3.93
ENGINEERING PLAN REVIEW AND CONSTRUCTION INSPECTION FEES
Sections:
3.93.010 Construction plan review required – Plan review and inspection fees.
3.93.015 Timing for payment of construction plan review and inspection fees.
3.93.010 Construction plan review required – Plan review and inspection fees.
In cases where construction of water, sewer or storm sewer system improvements is part and parcel of a subdivision or any other development, construction plans stamped by a registered engineer must be submitted to the director for review and approval in accordance with city standards and specifications. The appropriate number of copies of such preliminary plans, as noted in the city standards, shall be submitted to the director for plan review and approval by department personnel or their designees. Plan review and inspection fees are as follows:
Plan review |
||
• Base fee |
$500.00 |
Plus cost recovery1 |
• Additional fee |
$50.00/lot2 |
|
Construction inspection |
||
• Base fee |
$1,000.00 |
Plus cost recovery1 |
• Additional fee |
$100.00/lot2 |
|
1Actual cost of consultant review.
2For five or more lots.
(Ord. 1880 § 2 (Exh. B), 2019; Ord. 1609 § 1 (Exh. A), 2008; Ord. 1534 § 1, 2005; Ord. 1512 § 1, 2005; Ord. 1458 § 1, 2003; Ord. 1140 § 1, 1994. Formerly 13.24.030)
3.93.015 Timing for payment of construction plan review and inspection fees.
(1) Base and Additional Plan Review Fees. Base and additional (in the case of five or more lots) plan review fees are to be paid at the time construction plans are submitted for review.
(2) Nonemployee Consultant Plan Review Charges to the City. Nonemployee consultant plan review charges to the city will be billed to the applicant. All charges, including consultant plan review costs, shall be paid within 20 days of invoice by the city or prior to the city’s release of approved construction plans, whichever is sooner.
(3) Inspection Fees. Base and additional (in case of five or more lots) inspection fees are to be paid when the director of community development approves construction plans for construction, and prior to release of the signed construction plans by the city. Nonemployee consultant inspection costs will be calculated using actual billing rate of the staff for the hours of inspection required. A 15 percent administration fee will be added to the cost of personnel and associated fees paid. All after hours inspections must be prescheduled and will be billed out as noted in this section. The owner/engineer will be notified if the fees for the required inspections exceed the base fees paid. The owner is required to pay for any inspections that exceed the base fee. All inspection fees must be paid in full prior to signing of the final plat. (Ord. 1609 § 1 (Exh. A), 2008; Ord. 1534 § 1, 2005; Ord. 1512 § 1, 2005; Ord. 1458 § 1, 2003; Ord. 1140 § 1, 1994. Formerly 13.24.030)