Chapter 3.28
SCHEDULE OF DEVELOPMENT FEES AND FISCAL SECURITIES
Sections:
3.28.010 Schedule of development fees and fiscal securities.
3.28.010 Schedule of development fees and fiscal securities.
A. The fee for a new development agreement under Chapter 15.32 is $975.00.
B. Repealed by Ord. 2866-24.
C. The fee for an amended development agreement under Chapter 15.32 is $520.00.
D. The fee for the Community Development office review of each draft of a development agreement under Chapter 15.32 is $130.00 per hour for review time exceeding seven hours.
E. The fee for a petition for a special exception under Section 17.08.040(E) or 17.08.060(A) shall be $950.00 plus the actual costs of publication, as determined by the City Clerk.
F. The fee for a petition for any change in the text or map of the zoning code under Section 17.08.070(B)(1) shall be $1,120.00 plus the actual costs of publication, as determined by the City Clerk.
G. The fee for an appeal to the board of zoning appeals under Section 17.12.030(A) shall be $300.00.
H. The fee for the issuance of a zoning letter under Section 17.16.020(C) shall be the actual cost of staff wages and benefits for time in excess of the equivalent of $50.00 in staff time to fulfill the request.
I. The fee for a general plan review for a planned development district under Section 17.41.040(A)(8) shall be $3,380.00.
J. The fee for a specific plan review for a planned development district under Section 17.41.040(E)(14) shall be $1,560.00.
K. The fee for a floodplain amendment petition under Section 17.88.340 shall be $1,120.00 plus the actual costs of publication, as determined by the City Clerk.
L. The fee for the engineering review of a petition for a floodplain amendment under Section 17.88.340 shall be $130.00 per hour up to a maximum of $525.00.
M. The fee for a wetland permit under Section 17.92.110(B) shall be $195.00.
N. The fee for a new plan and method of operation review under Section 17.100.040 shall be $1,640.00.
O. The fee for a revised plan and method of operation review under Section 17.100.040 shall be $1,040.00.
P. The bond, certificate of deposit or letter of credit for landscape installation under Section 17.100.122(F)(1) shall be an amount equal to $2,550.00 per 1,000 square feet of streetyard.
Q. The bond or certificate of deposit for replacement landscaping under Section 17.100.122(F)(2) shall be an amount equal to $440.00 per 1,000 square feet of streetyard.
R. The cash deposit, bond, or letter of credit for landscape installation under Section 16.16.060(E)(1) shall be an amount equal to $2,550.00 per 1,000 square feet of streetyard.
S. Repealed by Ord. 2866-24.
T. Repealed by Ord. 2866-24.
U. (Repealed by Ord. 2103-07).
V. (Repealed by Ord. 2103-07).
W. (Repealed by Ord. 2103-07).
X. (Repealed by Ord. 2103-07).
Y. (Repealed by Ord. 2103-07).
Z. (Repealed by Ord. 2103-07).
AA. The fee for a conditional use under Section 17.108.050(E) shall be $340.00 plus the actual costs of publication as determined by the City Clerk.
BB. The fee for a conditional use for a telecommunication tower under Section 17.108.095(F)(1)(a) shall be $1,560.00.
CC. (Repealed by Ord. 2442-15).
DD. (Repealed by Ord. 2442-15).
EE. The amount of the fee for a special review under Section 17.108.100 by the staff of the Community Development Department shall be $130.00 per hour up to a maximum of $390.00.
FF. The fee for preliminary plat approval under Section 16.12.020(A) shall be $1,560.00.
GG. The fee for a preliminary concept map under Section 16.12.040(C) shall be $455.00.
HH. The fee for a certified survey map under Section 16.12.040(C)(4) shall be $390.00 plus actual recording costs as determined by the Director of Community Development.
II. The fee for a final plat under Section 16.12.030(A) shall be $390.00.
JJ. The fee for the review of each development agreement by the City Attorney’s office is $210.00 per hour.
KK. The fee for engineering review of a development agreement, PDD general or specific plan, new or revised plan and method of operation, preliminary or final plat, preliminary concept map, or certified survey map shall be $130.00 per hour.
LL. The fee for a permit under Title 14, Stormwater Management, shall be $400.00.
MM. The fee for independent landscape plan review per Section 17.100.050(H) shall be the actual cost of the independent plan review performed by an outside party.
NN. (Repealed by Ord. 2806-22).
OO. (Repealed by Ord. 2806-22).
PP. The fee for a minor stormwater management plan permit under Title 14 shall be $195.00. Engineering fees may apply.
QQ. The fee for a minor revision to plan and method of operation review under Section 17.100.040 shall be $390.00. Additional engineering review fees may apply.
RR. The fee for an administrative approval under Section 17.100.020(B) by the staff of the Community Development Department shall be $130.00 per hour up to a maximum of $390.00.
SS. The fee for a permit to excavate or place facilities in the city right-of-way, in addition to any applicable restoration deposit, and inspection or degradation fees, shall be $90.00.
TT. The fee for registration for right-of-way occupancy shall be $90.00.
UU. In addition to any inspection fees, the fee for a connection permit shall be $90.00.
VV. The fee for a temporary use permit shall be $100.00.
WW. The fee for public works inspection is per hour based on wages and benefits. (Ord. 2866-24 § 8, 2024; Ord. 2806-22 § 1, 2022)