Division 13-01-003
Work in Public Ways
Sections:
13-01-003-0001 Qualifications of Designer
13-01-003-0002 Work Not Intended to Become Public Property (e.g., Utility Company Installations)
13-01-003-0003 Work Intended to Become Public Property
13-01-003-0004 Qualifications of Contractor
13-01-003-0001 Qualifications of Designer
All plans and designs for public improvements shall be prepared by a professional civil engineer registered in the State of Arizona and shall bear their seal and signature. Survey legal descriptions and plats shall be prepared by a land surveyor registered in the State of Arizona and must bear that land surveyor’s seal and signature. (Ord. 2017-22, Rep&ReEn, 07/05/2017)
13-01-003-0002 Work Not Intended to Become Public Property (e.g., Utility Company Installations)
All improvements within City rights-of-way, not intended to become public property, shall be constructed or maintained under the terms of a franchise agreement or other authorization from the City. The location of such facilities, their installation, and the restoration of the area after installation, shall be done in accordance with these regulations. (Ord. 2017-22, Rep&ReEn, 07/05/2017)
13-01-003-0003 Work Intended to Become Public Property
All improvements which are intended to become public property shall be constructed according to these regulations, conditions shown on the public works permit, and plans approved by the City Engineer. (Ord. 2017-22, Rep&ReEn, 07/05/2017)
13-01-003-0004 Qualifications of Contractor
All improvements shall be constructed by contractors licensed by the Arizona State Registrar of Contractors, with a class of license(s) appropriate for the specific work being performed. (Ord. 2017-22, Rep&ReEn, 07/05/2017)