Division 13-10-013
Use of Uncompleted Streets within a Subdivision

Sections:

13-10-013-0001    Use of Uncompleted Streets within a Subdivision

13-10-013-0001 Use of Uncompleted Streets within a Subdivision

Use of uncompleted streets within a subdivision by construction or residential traffic will be allowed; provided, that:

A.    All on-site and off-site collector and arterial streets associated with the development are complete and accepted by the City Engineer.

B.    All local streets have at a minimum a two (2) inch lift of asphalt pavement in place.

C.    The developer has posted an assurance with the City that covers the remaining streets construction.

D.    All other private and public infrastructure, including dry utilities, associated with the development must be complete and accepted by the City Engineer.

E.    All water valve boxes within the development that are within the first lift of asphalt shall be paved up to the box and cover (excluding the concrete collar).

F.    All sewer manholes within the development that are within the first lift of asphalt shall be paved up to the ring and cover (excluding the concrete collar).

G.    An agreement has been executed by the subdivision developer that obligates the developer to ensure the continued repair and maintenance of street improvements until acceptance by the City. (Ord. 2017-22, Rep&ReEn, 07/05/2017)