Sections:
13-17-001 General
13-17-001 General
Erosion control applies to improvements within the City and as part of the erosion control section of a stormwater pollution prevention plan (SWPPP). Materials, means and methods for erosion control and stabilization, best management practices (BMPs), erosion control plans (ECPs), and SWPPPs are described in the City of Flagstaff Stormwater Design Manual.
The owner, developer and/or contractor is responsible for complying with the requirements of the National Pollutant Discharge Elimination System (NPDES) permit program. This generally includes submittal of a notice of intent to the Arizona Department of Environmental Quality (ADEQ) and notice of termination to ADEQ for the project. Preparation and implementation of a stormwater pollution prevention plan (SWPPP) for the site is required in accordance with ADEQ and City of Flagstaff Engineering Standards.
All disturbed areas within the project site and as shown on the plans shall be stabilized. Work shall be performed according to the provisions of this section and shall include but not be limited to the furnishing, hauling, placement and application of erosion control materials.
It is recommended that contractors see the ADEQ Smart NOI (notice of intent) program website for information and processes. (http://az.gov/webapp/noi/main.do) (Ord. 2017-22, Rep&ReEn, 07/05/2017)