Chapter 15.64
PERMIT PROCESS FOR ELECTRIC VEHICLE CHARGING STATIONS
Sections:
15.64.040 Electric vehicle charging station requirements.
15.64.050 Application and documents.
15.64.060 Permit review requirements.
15.64.010 Purpose.
The purpose of this chapter is to adopt an expedited, streamlined permitting process for electric vehicle charging stations that complies with AB 1236 (Chapter 598, Statutes 2015, Cal. Gov’t Code § 65850.7) to achieve timely and cost-effective installations of electric vehicle charging stations. This chapter allows the city to achieve these goals while protecting the public health and safety. (Ord. 04-2016 § 47, 3-1-16.)
15.64.020 Definitions.
(a) “Electric vehicle charging station(s)” or “charging station(s)” means any level of electric vehicle supply equipment station that is designed and built in compliance with Cal. Elec. Code Article 625, as it reads on the effective date of this chapter or as it may be amended, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(b) “Specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. (Ord. 04-2016 § 47, 3-1-16.)
15.64.030 Applicability.
(a) This chapter applies to the permitting of all electric vehicle charging stations in the city.
(b) Electric vehicle charging stations legally established or permitted prior to the effective date of this chapter are not subject to the requirements of this chapter unless physical modifications or alterations are undertaken that materially change the size, type, or components of a charging station in such a way as to require new permitting. Routine operation and maintenance or like-kind replacements shall not require a permit.
(c) Historical architectural review pursuant to Chapters 18.175 and 18.135 shall be required if the electric vehicle charging station is proposed to be located on property containing a registered or potential registered resource. (Ord. 04-2016 § 47, 3-1-16.)
15.64.040 Electric vehicle charging station requirements.
(a) All electric vehicle charging stations shall meet applicable health and safety standards and requirements imposed by the state and the city.
(b) Electric vehicle charging stations shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and where applicable, rules of the Public Utilities Commission regarding safety and reliability. (Ord. 04-2016 § 47, 3-1-16.)
15.64.050 Application and documents.
(a) All documents required for the submission of an electric vehicle charging stations application shall be made available on the city’s website.
(b) Electronic submittal of the required permit application and documents by facsimile shall be made available to all electric vehicle charging station permit applicants. An applicant’s electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature.
(c) The city’s building and safety division shall adopt a checklist of all requirements with which the electric vehicle charging stations shall comply to be eligible for expedited review. The electric vehicle permit process, standard(s) and checklist(s) may substantially conform to recommendations for permitting, including the checklist and standards contained in the “Plug-In Electric Vehicle Infrastructure Permitting Checklist” of the “Zero-Emission Vehicles in California: Community Readiness Guidebook” published by the Office of Planning and Research. (Ord. 04-2016 § 47, 3-1-16.)
15.64.060 Permit review requirements.
(a) The building official shall implement an administrative review process to expedite approval of electric vehicle charging stations. Where the application meets the requirements of the approved checklist and standards and there are no specific, adverse impacts upon public health or safety, the building and safety division shall complete the building permit approval process, which is nondiscretionary. Review of the application for electric vehicle charging stations shall be limited to the building official’s review of whether the application meets local, state, and federal health and safety requirements.
(b) The building official may require an applicant to apply for an “electric vehicle charging station use permit” if the building official finds, based on the initial application submittal, that the electric vehicle charging stations could have a specific, adverse impact upon the public health and safety. The building official’s decision may be appealed to the planning commission in accordance with Chapter 18.300.
(c) If an electric vehicle charging station use permit is required, the building official may only deny an application for the electric vehicle charging station use permit if the official makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid the adverse impact. Such findings shall include the basis for the rejection of the potential feasible alternative for preventing the adverse impact. The building official’s decision may be appealed to the planning commission in accordance with Chapter 18.300.
(d) If the building official issues an electric vehicle charging station use permit, the permit may include conditions designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.
(e) A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by the city on another similarly situated application in a prior successful application for a permit.
(f) If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission. (Ord. 04-2016 § 47, 3-1-16.)
15.64.070 Fees.
The city council may establish by resolution the fees that shall be charged for permits issued under this chapter. (Ord. 04-2016 § 47, 3-1-16.)