CHAPTER 4
FEES FOR WATER TRANSMISSION, STORAGE AND PRODUCTION AND TREATMENT FACILITIES
SECTION:
§3862 Fire Service Or Fire Sprinkler Connection
§3860 PURPOSE
New structures built in the City requiring water service create demand for additional water storage capacity, water transmission lines, and water production and treatment facilities. In order to provide these facilities the following fees are established. (Ord. 647, §1, adopted 1973; amd. by Ord. 662, §1, adopted 1974)
§3861 WATER CONNECTION FEES
A. Payment Of Fees: The storage and transmission and production and treatment facilities’ fees are based on the size of the service. Said fees shall be due and payable prior to use and occupancy of the new facility requiring the service. No certificate of occupancy shall be issued and permanent water service shall not be provided until payment is received.
Meter Size |
Fee per Connection |
---|---|
3/4" |
$1,569 |
1" |
$2,615 |
1 1/2" |
$5,230 |
2" |
$8,368 |
3" |
$16,736 |
4" |
$26,150 |
5" and larger |
To be determined by City Council |
B. Connection Fees For Accessory Dwelling Units:
1. Accessory dwelling units shall not be considered new residential uses for the purposes of calculating connection fees or capacity charges.
2. No new water connection shall be required, and no fee charged, for an accessory dwelling unit (as defined in section 9278 of this code) contained within the space of an existing primary residence or accessory structure, unless the accessory dwelling unit was constructed with a new single-family home.
3. Accessory dwelling units that are not contained within the space of an existing primary residence or accessory structure are subject to connection fees for water service as provided in this section. (Ord. 647, Sec 1, adopted 1973; amd. by Ord. 662, §1, adopted 1974; Ord. 751, §2, adopted 1980; Ord. 810, §2, adopted 1983; Ord. 1145, §2, adopted 2013; Ord. 1164, §1, adopted 2015; Ord. 1181, §4, adopted 2017; Ord. 1205, §4, adopted 2020)
§3862 FIRE SERVICE OR FIRE SPRINKLER CONNECTION
Fire service or fire sprinkler connections shall be exempt from the payment of the storage or transmission or production and treatment facilities fees. However, a standby charge shall be levied as follows:
Size |
Charge |
---|---|
2" |
$ 3.00 |
4" |
6.00 |
6" |
9.00 |
8" |
12.00 |
(Ord. 647, §1, adopted 1974; amd. by Ord. 662, §1, adopted 1974)