15-68-010 Building permit fees.

The fees for building permits based on the cost of construction or repair or demolition of any structure, i.e., buildings, fences, sidewalks, signs, and the like, are as follows:

$50.00 for less than $1,000.00 and

3% the cost of the total job

 

Clean Up Deposit

$75.00 for up to $1,000.00

$250.00 for more than $1,000.00

 

Clean Up Only—$50.00

 

Occupancy Permit

$25.00

 

Demolition Permit Fees

8% the cost of the total job

(Ord. 3453 § 1, 2022; Ord. 3316 § 2 (part), 2015; Ord. 2932 § 3 (part), 1995: Ord. 2454 § 1, 1986: Ord. 2424 § 1 (part), 1985)

15-68-020 Contractors’ work permit.

The fee for contractors’ work permits is as follows:

General contractors

 

Full year

$250.00

All contractors are required to have a twenty thousand dollar ($20,000.00) surety bond and one million dollars ($1,000,000.00) of general liability insurance.

Plumbing contractors must be state licensed.

A ten thousand dollar ($10,000.00) plumber’s liability bond is required.

A ten thousand dollar ($10,000.00) mechanical contractor’s liability bond is required. (Ord. 3316 § 2 (part), 2015; Ord. 3221 § 38, 2009; Ord. 2424 § 1 (part), 1985)

15-68-030 Electrical fees.

Electrical fees in residential, commercial and manufacturing districts are as follows:

Minimum residential fee

$30.00

 

Minimum commercial fee

50.00

 

Change of service (first meter)

30.00

 

Each additional meter

10.00

 

Electric heat

4.00

per room

Air conditioner

50.00

plus

 

.50

per BTU

 

Major appliances

10.00

 

Lighting fixtures, sockets, receptacles

 

 

1 - 15

$10.00

 

16 - 30

15.00

 

31 - 45

20.00

 

Each additional fixture or socket

.50

 

Electric motors

$12.00

 

Under 5 horsepower

12.00

 

Over 5 horsepower

.50

per additional horsepower

Circuits:

 

 

Minimum residential

$35.00

 

Minimum commercial

50.00

 

or 3% of the total job; whichever amount is greater.

(Ord. 2932 § 3 (part), 1995: Ord. 2424 § 1 (part), 1985)

15-68-040 Sign permit fees.

The inspection fee for the installation of signs is as follows:

Minimum sign permit fee

$50.00

Minimum electrical permit for sign

50.00

or 3% of the total job; whichever amount is greater.

(Ord. 2932 § 3 (part), 1995: Ord. 2424 § 1 (part), 1985)

15-68-050 Plumbing fees.

The fees for installation of plumbing and plumbing work are as follows:

Minimum fee (1-5 fixtures or openings)

 

Residential

$35.00

Commercial

50.00

or 3% of the total job; whichever amount is greater.

Each additional unit:

 

Catch basin, grease traps, etc.

$10.00

Manholes

25.00

Cleanup deposit (refundable)

$150.00

Parkway, alley or street opening

$25.00

Deposit for each street opening (refundable)

250.00

Sewer tap

25.00

(Ord. 2932 § 3 (part), 1995: Ord. 2424 § 1 (part), 1985)

15-68-060 Mechanical fees.

The fees for mechanical work are as follows:

Residential minimum

$35.00

Commercial minimum

50.00

or 3% of the total job; whichever amount is greater.

(Ord. 2932 § 3 (part), 1995: Ord. 2424 § 1 (part), 1985)

15-68-070 Certificates of inspection.

The fees for certificates of inspection are as follows:

Residential Rentals

 

Single-Family

$150.00

Apartment Building

$150.00 for 1—2 units
$25.00/each additional

Commercial

$300.00

 

 

Point-of-Sale Inspections

 

Single-Family

$150.00

Apartment Building

$150.00 for 1—2 units
$25.00/each additional

Commercial

$300.00

(Ord. 3316 § 2 (part), 2015; Ord. 3221 § 39, 2009; Ord. 2932 § 3 (part), 1995: Ord. 2424 § 1 (part), 1985)

15-68-080 Planning and zoning commission matters.

The fees for plan commission/zoning board of appeals are as follows:

Rezoning and special use permit applications

$400.00

Plat subdivision

325.00

Planned unit development applications

500.00

Variance appeals

250.00

Commercial businesses (depending on the size of the business)

300.00—500.00

Public hearings

100.00

(Ord. 3462 §§ 10, 16, 2022; Ord. 3316 § 2 (part), 2015; Ord. 3221 § 40, 2009; Ord. 2932 § 3 (part), 1995: Ord. 2424 § 1 (part), 1985)

15-68-090 Fees for large construction projects.

The permit fees set forth in Sections 15-68-030, 15-68-050 and 15-68-060 of this chapter shall be reduced by fifty (50) percent of the amounts set forth therein for all construction the cost of which exceeds five hundred thousand dollars ($500,000.00). (Ord. 2454 § 2, 1986)

15-68-100 Payment of fees.

A.    Permit fees shall be paid prior to the commencement of the work or construction. In the event that the work or construction is commenced without the required permit or permits, an additional permit fee equal to fifty (50) percent of the original permit fee shall be charged. The additional permit fee provided for herein shall be in addition to any permit fees or penalties otherwise provided for in this chapter.

B.    Fees. When plans are submitted for approval under these codes, or when special engineering studies are deemed by the building official to be needed for the issuance of permits or approvals, said fee shall be the normal and customary fee charged by a firm with specialized expertise. The applicant shall be informed of the amount of the fee at the time that this application is filed. The fee schedule for specific improvement or construction is set forth in this chapter and is incorporated by reference herein. (Ord. 2932 § 2, 1995; Ord. 2444 § 1, 1986)