Chapter 25
PLUMBING1

Article I. In General

25-1    Plumbing code adopted.

25-2    Definitions.

25-3    Licensing of plumbers required.

25-4    Owners not required to be licensed.

25-5    Inspector to investigate and report violations.

25-6    Stop work order.

25-7    Reserved.

25-8    Plumbing work to be done under direction of inspector.

25-9    Plans of proposed plumbing and drainage work to be submitted to inspector as required.

25-10    Permit to be issued upon approval of plans; notice of rejection.

25-11    Changes in plans prohibited; exception.

25-12    Work not to begin until permit received and fee paid.

25-13    Provisions not applicable to certain repair and maintenance work.

25-14    Right to enter and inspect.

25-15    Certificate of inspection.

25-16    Inspection of existing buildings authorized.

25-17    Appeals.

25-18    Duration of permit.

25-19    Penalty for violations.

25-20—25-30.    Reserved.

Article II. Standards and Requirements

25-31    Pipes and fittings.

25-32    Main drain and sewer pipe.

25-33    Reserved.

25-34    Main Y, building trap, fresh air inlet.

25-35    Reserved.

25-36    Rainwater leaders.

25-37—25-40.    Reserved.

25-41    Water closets.

25-42    Connection to sewer.

25-43    Buildings used by public.

25-44    Materials and workmanship.

25-45    Test; inspection.


1

Editor’s note—An ordinance of Oct 24, 1988, in effect, amended Ch. 25 in its entirety to read as herein set out. Due to the nature of the amendment, a detailed analysis will not be given. Prior to amendment, Ch. 25, §§ 25-1—25-17 and 25-31—25-48 derived from an ordinance of June 30, 1981 and an ordinance of Sept. 24, 1984.

Cross reference—Buildings, Ch 8; electricity, Ch. 12; fire protection, Ch. 13; housing, Ch. 18; sewers and water pollution control, Ch. 26; subdivisions, Ch. 28; water, Ch. 31; zoning, App. A.