40.350.020    Transportation Concurrency Management System

A.    Purpose.

    This section implements the requirements in RCW 36.70A.070 that counties:

1.    Establish level of service standards for arterial and transit routes; and

2.    Ensure that such standards are met or reasonably funded before new development is approved.

B.    Applicability.

    This section applies to applications for subdivision, short subdivision, conditional use permit approvals, and site plan review, except for those site plan reviews for unoccupied utility and wireless communication facilities which have a potential vehicular impact on the level of service of a segment or intersection of either:

1.    Any county roadway with a comprehensive plan functional classification of arterial or collector; or

2.    Any state highway of regional significance.

(Amended: Ord. 2007-11-13)

C.    Review Authority.

    The review authority shall approve, approve with conditions, or deny proposed developments in accordance with the provisions of this section.

D.    Transportation Impact Study.

1.    A transportation impact study shall be required for all development applications in which the proposed development is projected to have an impact upon any affected transportation corridor or intersection of regional significance, unless the development application is exempt from the provisions of this section as provided for in Section 40.350.020(D)(7), or the requirement for a study has been waived by the Public Works Director.

2.    A transportation impact study shall include, at a minimum, an analysis of the following elements:

a.    Trip generation, modal split, distribution, and assignment for the proposed development; and

b.    An analysis of the projected impact of the proposed development upon the current operating level and safety of affected transportation corridors and intersections of regional significance. The analysis shall also include an accounting of trips assigned to all collector and arterial roadways.

3.    A transportation impact study shall be prepared by and/or under the supervision of a registered professional engineer in the state of Washington.

4.    A transportation impact study shall be based on traffic counts obtained within twelve (12) months of the fully complete date of the development application as determined under Sections 40.510.010(B), 40.510.020(C), and 40.510.030(C). The traffic counts shall reflect representative traffic conditions on collector and arterial roadways, and at intersections of regional significance. Intersections of regional significance are those intersections where at least three (3) legs are collector or arterial classification roadways.

5.    A transportation impact study shall not be required to analyze impacts on affected transportation corridors or intersections of regional significance located at least the following distances from the proposed development (as measured by straight-line distance):

a.    Fifty (50) or less new peak period trips at development site: one (1) mile;

b.    Fifty-one (51) to two hundred fifty (250) new peak period trips at development site: two (2) miles;

c.    Two hundred fifty-one (251) or more new peak period trips at development site: three (3) miles.

6.    The Public Works Director reserves the right to require an applicant to provide additional data and/or analysis as part of a particular transportation impact study, where the Public Works Director determines that additional information or analysis is required to implement the standards and requirements contained in this section.

7.    No traffic impact study shall be required, pursuant to the provisions of this section, where the proposed development will generate less than ten (10) peak period vehicle trips. However, these proposed developments are still subject to concurrency reviews and require concurrency approvals.

8.    Upon the written request of an applicant, the Public Works Director may waive the requirement for a transportation impact study, or limit the scope of analysis and required elements of a traffic impact study where the Public Works Director determines that the potential transportation impacts upon the affected transportation corridor(s) and/or intersection(s) of regional significance have been adequately analyzed in prior research or reports and/or are not projected to cause a reduction in the operating level of affected transportation corridors and/or intersections.

E.    Requirements for Concurrency Approval.

1.    Each development application subject to the provisions of this section shall require a concurrency review. No development application may be approved by the review authority until such time as a concurrency approval or conditional concurrency approval has been issued by the Public Works Director.

2.    The concurrency determination for multiple development applications impacting the same transportation corridors or intersections shall be tested chronologically in accordance with the respective applications’ fully complete dates as determined under Sections 40.510.010(B), 40.510.020(C), and 40.510.030(C) (but not the contingent vesting provisions of Sections 40.510.010(D), 40.510.020(G), and 40.510.030(G)). For the purpose of this subsection only, the fully complete date for an application delayed in processing for sixty (60) days or longer due to actions or inaction of the applicant (as determined by the responsible official) shall be adjusted according to the length of such delay. Preapplication concurrency reviews shall be tested in the order they are received.

3.    The Public Works Director shall issue a concurrency approval where the Public Works Director determines that the proposed development’s impacts upon all affected transportation corridors and intersections of regional significance do not result in the operating levels for the transportation corridors, signalized intersections, and unsignalized intersections falling below the adopted level of service standards established in Section 40.350.020(G).

4.    A concurrency review and approval shall not be required for those affected transportation corridors and intersections of regional significance further away than the distances identified in Section 40.350.020(D)(5).

5.    The Public Works Director may approve and condition mitigation (if volunteered by the applicant) where the Public Works Director determines that the proposed development’s projected impacts upon an affected transportation corridor or intersection of regional significance can be offset by the mitigation such that the operating levels will not further deteriorate because of the additional traffic generated by the proposed development. The review authority may approve a development when the Public Works Director determines that achieving the level of service standards would cause significant negative environmental impacts as identified in a SEPA review.

6.    Appeals to the determination of the Public Works Director with respect to concurrency shall be made in accordance with Sections 40.510.010(E), 40.510.020(H), and 40.510.030(H). Applications reviewed as Type I and Type II procedures shall be appealed as Type II procedures. For applications reviewed as Type III procedures, the Public Works Director’s determination shall be treated as a recommendation to the review authority.

(Amended: Ord. 2012-05-25)

F.    Determination of Operating Levels.

    The operating level for a transportation corridor, signalized intersection, and/or unsignalized intersection shall be defined as the traffic characteristics of those roadways and intersections with consideration of the following factors:

1.    The existing traffic levels on the roadways and intersections;

2.    Any mitigation measures proposed by the applicant.

a.    For site plans, mitigation measures shall be completed and/or implemented prior to occupancy or commencement of the use.

b.    For land divisions, mitigation measures shall be completed and/or implemented prior to:

(1)    Final plat approval; or

(2)    Issuance of the first building permit for any newly recorded lot, provided:

(a)    The improvements are secured by a performance bond or financial guarantees acceptable to the county prior to final plat.

(b)    Construction plans shall be approved, and any needed right-of-way for the mitigation improvements have been obtained prior to final plat approval.

(c)    “Model home” building permits issued subject to the requirements of Section 40.260.175 do not require bonding or right-of-way acquisition necessary for transportation concurrency mitigation measures.

3.    Any mitigation measures conditioned to other approved developments which will be completed and/or implemented prior to occupancy of the proposed development;

4.    The traffic impacts of the proposed development on the affected transportation corridors and intersections;

5.    The traffic impacts of other approved developments not yet fully built-out on the affected transportation corridors and intersections;

6.    Any improvements being implemented as part of the county’s transportation improvement program that are reasonably funded and scheduled for completion of construction within six (6) years of the final date for a decision upon the development application;

7.    Any capacity which has been assigned or reserved to other and/or future developments pursuant to the terms of a development agreement or capacity reservation authorized and executed under the provisions of this chapter;

8.    Any background traffic growth or traffic from developments exempt from the requirements of this chapter that the Public Works Director determines could have an impact on the operating level of the transportation corridors or intersections;

9.    Any other factors that the Public Works Director has determined could have an impact on the operating level of the transportation corridors or intersections.

(Amended: Ord. 2007-04-13; Ord. 2007-09-12; Ord. 2007-11-09; Ord. 2009-12-01; Ord. 2011-08-08)

G.    Level of Service Standards.

1.    Level of service or LOS standards shall be as follows:

a.    The maximum volume to capacity ratio for each roadway segment shall not exceed nine-tenths (0.9), when measured independently for each direction of travel. Measurements shall be made for all collector and arterial roadway segments located within the Vancouver Urban Growth Area, but outside of the City of Vancouver. Measurements shall also be made for state highways of regional significance. In calculating the volume to capacity ratio, the volume shall be determined based on the factors described in Section 40.350.020(F). In determining the capacity for roadways built-out to county standards, the capacity shall be based on the factors described in Table 40.350.020-1, Roadway Capacities. For roadways not fully built-out to county standards, the capacity shall be determined based on the current roadway condition. For roadways with lane widths twelve (12) feet and greater, and with paved shoulder widths two (2) feet and greater, the lane capacity shall be eight hundred (800) vehicles per hour. For roadways with lane widths between eleven (11) and twelve (12) feet and with paved shoulder widths two (2) feet and greater, the lane capacity shall be seven hundred (700) vehicles per hour. For roadways with lane widths less than eleven (11) feet, the lane capacity shall be six hundred (600) vehicles per hour.

Table 40.350.020-1 Roadway Capacities 

Roadway Type

County Designation

Single Direction Capacity/Hour

Urban

Arterials

Parkway

Pa-4b

2000

Principal

Pr-4cb

1800

Minor, 4-lane

M-4cb

1800

Minor, 2-lane

M-2cb

900

Collector

Urban

C-2cb

900

Urban

C-2

800

Urban

C-2b

800

Rural

Arterial

RA

800

Collector

Major

R-2

800

Minor

Rm-2

800

b.    Individual movements at each signalized intersection of regional significance in the unincorporated county shall not exceed an average of two (2) cycle lengths or two hundred forty (240) seconds of delay (whichever is less).

c.    All unsignalized intersections of regional significance in the unincorporated county shall achieve LOS E standards or better (if warrants are not met). If warrants are met, unsignalized intersections of regional significance shall achieve LOS D standards or better. Intersection control or mitigation of unsignalized intersections shall be at the discretion of the Public Works Director and shall not obligate the county to meet this LOS standard. However, proposed developments shall not be required to mitigate their impacts in order to obtain a concurrency approval unless:

(1)    The proposed development adds at least five (5) peak period trips to a failing intersection approach; and

(2)    The worst movement on the failing approach is worsened by the proposed development. In determining whether the movement is worsened, the Public Works Director shall consider trip volume, delay, and any other relevant factors.

d.    The LOS standards identified in this subsection shall be applied during peak period traffic conditions, as defined by the responsible official and published in the administrative manual.

2.    The LOS standards established in this subsection shall be applied and interpreted as stated in the administrative manual prepared pursuant to Section 40.350.020(N).

3.    The LOS standards and the operating levels for each transportation corridor and intersection of regional significance shall be evaluated and reviewed on an annual basis by Council.

4.    Notwithstanding the provisions for the annual review of LOS standards pursuant to this section, Council reserves the authority to enact and renew emergency moratoria and interim zoning or other official controls upon development approvals affecting designated transportation corridors and intersections of regional significance pursuant to RCW 36.70A.390, and may specify qualifications or conditions for the application of such moratoria and interim zoning or other official controls.

(Amended: Ord. 2010-08-06; Ord. 2019-05-07)

H.    Exemptions from Concurrency Requirements.

    The following types of development applications shall not be subject to a concurrency denial:

1.    K – 12 public schools incorporating commitments to commute trip reduction consistent with Chapter 5.50;

2.    Fire/police stations;

3.    Public transit facilities;

4.    Neighborhood parks.

(Amended: Ord. 2006-05-01)

I.    Concurrency Survey.

1.    For purposes of monitoring the cumulative transportation-related impacts of developments which are exempt from the requirements of this section, such development applications shall be required to submit a concurrency survey for review by the Public Works Director.

2.    Submittals of concurrency surveys shall be made upon written forms provided by the Director and shall be filed with the Public Works Director. The concurrency survey shall indicate, at a minimum:

a.    The type and location of the development;

b.    An identification of all affected transportation corridors and intersections of regional significance;

c.    The specific reason the development is exempt from the provisions of this section;

d.    An estimate of the projected total peak period trips that will be generated by the development; and

e.    An estimate of the date of occupancy of the development.

3.    The Public Works Director shall review and approve the concurrency survey, and may require the submission of additional information prior to approving the survey.

4.    No development application may be approved by the review authority until such time as the applicant has complied with the requirements of this subsection, and the Public Works Director has approved the concurrency survey.

J.    Reservation of Capacity.

1.    Upon issuance of a concurrency approval by the Public Works Director, the transportation capacity allocated by the Public Works Director to the development application shall become encumbered capacity. This encumbered capacity shall not be considered for use by another development application until such time as the concurrency approval expires pursuant to Section 40.350.020(J)(4).

2.    Upon issuance of a development approval by the review authority, this encumbered capacity shall become reserved capacity and shall not be considered for use by another development application.

3.    Reserved capacity shall not be transferable to another development upon another site. Reserved capacity from a previous development approval shall not be transferable to a different land use development upon the same site.

4.    Concurrency approvals shall be valid for the same period of time as the development approval, and shall expire upon the date the development approval expires. Notwithstanding the provisions of this subsection, a concurrency approval shall expire upon the date the development application for which the concurrency approval was required is:

a.    Withdrawn by the applicant;

b.    Denied approval by the review authority; provided, that for purposes of this section, an application shall not be deemed to be denied by the review authority until a final decision has been issued pursuant to any administrative appeal under Sections 40.510.010(E), 40.510.020(H), and 40.510.030(H); or until a final decision has been rendered by a superior court with competent jurisdiction, where such judicial appeal has been filed in a timely way; or

c.    Not found to be fully complete within one hundred eighty (180) days of a pre-application concurrency approval.

(Amended: Ord. 2012-05-25)

K.    Capacity Reservation for Development Agreements.

    Council may reserve capacity, prior to approval of a development application by the review authority, through the approval of a development agreement authorized and executed under the provisions of RCW 36.70B.170. This reserved capacity shall be accounted for in establishing and reviewing LOS standards and in the determination of operating levels for transportation corridors and intersections.

(Amended: Ord. 2019-05-07)

L.    Capacity Reservation for a Preferred Land Use.

1.    Where Council finds that there is a significant public interest or need to provide for the approval of a preferred land use that would affect the transportation corridors and/or intersections of regional significance, Council following a public hearing may provide for the reservation of capacity for such land use. Council may direct, by ordinance, that the transportation capacity necessary to accommodate such land use be reserved for the future approval of such land uses.

2.    Such reservation shall be for an identified period of time and shall be subject to annual review by Council. This reserved capacity shall be accounted for in establishing and reviewing LOS standards and in the determination of operating levels for the transportation corridors and intersections.

(Amended: Ord. 2019-05-07)

M.    Deferral of Reserved Capacity.

    If reserved trips from a development agreement (Section 40.350.020(K)) are not scheduled to be utilized for at least five (5) years, Council by administrative resolution may direct that all or a portion of such out-year trips be excluded in concurrency testing of other project applications where anticipated transportation improvement projects, whether or not deemed reasonably funded, are expected to increase capacity on the impacted corridor(s)/intersection(s) by at least the volume of the out-year trips so deferred. When deferring use of reserved trips, the reserved trips will remain vested with the original party to the developer agreement and will be available for use by that party consistent with any conditions in the development agreement.

(Amended: Ord. 2019-05-07)

N.    Establishment of Administrative Manual.

1.    The Public Works Director shall establish and adopt the methodology and criteria to be used to identify transportation corridors and evaluate the operating level for each transportation corridor and intersection of regional significance.

2.    The Public Works Director shall establish and adopt the methodology and criteria to be used to identify and evaluate the transportation impacts of developments which are required to be addressed in the transportation impact studies required by Section 40.350.020(D).

3.    The Public Works Director shall publish and regularly update an administrative manual setting forth the methodology and criteria adopted for the purposes described in Sections 40.350.020(N)(1) and (N)(2).

4.    A copy of the most recent version of the administrative manual shall be made available for public inspection and review.

5.    The provisions of the administrative manual shall be consistent with and implement the provisions of this section. To the extent the provisions of the manual are inconsistent with the provisions of this section, the provisions of this section shall control.

O.    Mitigated Level of Service for Master Planned Developments.

    Mitigated level of service standards may be established, for master planned industrial, university or office uses, which the review authority finds:

1.    Are approved for master plan development under Section 40.520.070 for properties zoned light industrial (IL) or are approved as a master development plan under Section 40.230.050 for properties zoned university (U), or if previously approved, are found to substantially comply with Section 40.230.050 or 40.520.070;

2.    Are served by a transportation corridor which incorporates measures to mitigate traffic congestion, such as high occupancy vehicle lanes, fifteen (15) minute or better peak hour transit service, freeway ramp metering, or traffic signal coordination; and

3.    Incorporates a commitment to commute trip reduction for all industrial, university and office on-site employers, consistent with Chapter 5.50.

(Amended: Ord. 2007-11-09; Ord. 2012-12-14)

P.    Application of SEPA to the Director’s Determinations.

    Any determination made by the Public Works Director pursuant to this section shall be an administrative action that is categorically exempt from the State Environmental Policy Act.

(Amended: Ord. 2006-09-05; Ord. 2014-08-09; Ord. 2017-04-13)