Chapter 13.08
GRADING AND EXCAVATION CODE1

Sections:

Article I. General Provisions

13.08.010    Title reference.

13.08.020    Grading manual.

13.08.030    Purpose and intent.

13.08.040    Scope.

Article II. Definitions

13.08.050    Definitions.

Article III. Permits Required

13.08.060    Grading permits.

13.08.070    Grading permit – Watercourse alteration.

13.08.080    Excavation blasting permit.

13.08.090    Types of grading permits.

Article IV. Organization and Enforcement

13.08.100    Powers and duties of the building official.

13.08.110    Violations and penalties.

13.08.120    Hazardous conditions.

Article V. Grading Permit Requirements

13.08.130    Permits required.

13.08.140    Application.

13.08.150    Plans and specifications.

13.08.160    Information on plans and specifications.

13.08.170    Soil engineering and engineering geology reports.

13.08.180    Issuance, expiration and renewal.

13.08.190    Denial of permit.

13.08.200    Time of grading operations.

13.08.210    Responsibility of permittee.

13.08.220    Protection of adjoining property.

13.08.230    Import and export of earth material.

Article VI. Fees

13.08.240    Grading plan check fees.

13.08.250    Grading permit fees.

13.08.260    Cost recovery fees.

Article VII. Security

13.08.270    Grading permit security.

Article VIII. Cuts

13.08.280    Cuts.

Article IX. Fills

13.08.290    Fills.

Article X. Setbacks

13.08.300    Setbacks.

Article XI. Drainage and Terracing

13.08.310    Conformance to grading manual.

Article XII. Asphalt Concrete Pavement

13.08.320    Asphalt concrete pavement.

Article XIII. Erosion Control

13.08.330    Erosion control and water quality requirement systems.

13.08.340    Erosion control plans.

13.08.350    Erosion and sediment control and water quality requirement system maintenance.

Article XIV. Grading Inspection

13.08.360    General.

13.08.370    Grading requirements.

13.08.380    Notification of noncompliance.

13.08.390    Transfer of responsibility for approval.

13.08.400    Site inspection by the building official.

13.08.410    Special inspections.

Article XV. Completion of Work

13.08.420    Final reports.

13.08.430    Notification of completion.

Article I. General Provisions

13.08.010 Title reference.

This chapter shall be known as and may be cited as the Aliso Viejo grading and excavation code. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-800)].

13.08.020 Grading manual.

A. The director shall formulate and modify as necessary such rules, procedures, and interpretations as may be necessary or convenient to administer this chapter. Such rules, procedures and interpretations shall be referred to as the “grading manual.”

B. The grading manual shall include provisions to assure that the water quality requirements apply to all activities subject to this chapter.

C. In the event of any conflict between the grading manual and this chapter, the provisions of this chapter shall govern. The provisions of the grading manual shall, to the extent that they are made conditions of any grading permit by the building official, be binding on the permittee. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-801)].

13.08.030 Purpose and intent.

It is the intent of this code to safeguard life, limb, property, and the public welfare by regulating grading on private property of the city of Aliso Viejo. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-802)].

13.08.040 Scope.

This chapter sets forth rules and regulations to control excavation, grading, and earthwork construction, including fills and embankments, and establishes administrative requirements for issuance of grading permits and approval of plans and inspection of grading construction in accordance with the requirements for grading and excavation as contained in the Uniform Building Code then in effect as adopted and modified by city ordinance as well as water quality requirements relevant to activities subject to this chapter. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-803)].

Article II. Definitions

13.08.050 Definitions.

“Approval” shall mean a written engineering or geological opinion by the responsible engineer, geologist of record or responsible principal of the engineering company concerning the progress and completion of the work unless it specifically refers to the building official.

“Approved plans” shall mean the current grading plans which bear the stamp of approval of the building official.

“Approved testing agency” shall mean a facility whose testing operations are controlled and monitored by a registered civil engineer and which is equipped to perform and certify the tests required by this chapter, or the grading manual, as determined by the building official. This determination may be appealed to the city council.

“Borrow” is earth material acquired from an off-site location for use in grading on a site.

“Building official” is the city’s building official or his or her designee.

“Civil engineer” shall mean a professional engineer registered in the state of California to practice in the field of civil engineering.

“Civil engineering” shall mean the application of the knowledge of the forces of nature, principles of mechanics and the properties of materials for the evaluation, design, and construction of civil works for the beneficial uses of mankind.

“Clearing,” “brushing,” and “grubbing” shall mean the removal of vegetation (grass, brush, trees, and similar plant types) by mechanical means.

“Commercial coach” is a vehicle with or without motive power, designed and equipped for human occupancy for industrial, professional or commercial purposes, and shall include a trailer coach.

“Compaction” is the densification of a fill by mechanical means.

“Director” shall mean director of public works or his duly delegated representative.

“Earth material” is any rock, natural soil or fill and/or any combination thereof.

“Engineering geologist” shall mean a geologist certified in the state of California to practice engineering geology.

“Engineering geology” shall mean the application of geologic knowledge and principles in the investigation and evaluation of naturally occurring rock and soil for use in the design of civil works.

“Erosion” is the wearing away of the ground surface as a result of the movement of wind, water, and/or ice.

“Erosion control system” is a combination of desilting facilities, and erosion protection, including effective planting, to protect adjacent private property, watercourses, public facilities and receiving waters from an abnormal deposition of sediment or dust.

“Excavation” is the mechanical removal of earth material.

“Existing grade” is the ground surface prior to grading.

“Fill” is a deposit of earth material placed by artificial means.

“Finished grade” is the final grade of the site which conforms to the approved plan.

“Grade” shall mean the vertical location of the ground surface.

“Grading” is any excavating or filling or combination thereof.

“Grading contractor” is a contractor licensed and regulated by the state of California who specializes in grading work or is otherwise licensed to do grading work.

“Grading permit” is an official document or certificate issued by the building official authorizing grading activity as specified by approved plans and specifications.

“Hillside site” is a site which entails cut and/or fill grading of three feet or more in vertical height below or above natural ground; or a combination fill-over-cut slope equal to or greater than five feet in vertical height; or where the existing grade is 20 percent or greater; and which may be adversely affected by drainage and/or stability conditions within or from outside the site, or which may cause an adverse effect on adjacent property.

“Mobilehome” means a structure, transportable in one or more sections, designed and equipped to contain not more than two dwelling units to be used with or without a foundation system. Mobilehome does not include recreational vehicle, commercial coach, or factory-built housing.

“Natural grade” is the ground surface unaltered by artificial means.

“Owner” is any person, agency, firm, or corporation having a legal or equitable interest in a given real property.

“Permanent erosion control devices” are improvements which remain throughout the life of the development. They include terrace drains, downdrains, slope landscaping, channels, storm drains, etc.

“Precise grading permit” is a permit that is issued on the basis of approved plans which show the precise structure location, finish elevations, and all on-site improvements.

“Preliminary grading permit” is a permit that is issued on the basis of approved plans which need not show a structure location but must show interim building pad drainage to the degree required by the building official.

References. Unless indicated otherwise, or as reasonably appears from the context, references in this code to the civil engineer, the soil engineer, the geologist, and the engineering geologist refer to the professional person(s) preparing, signing, or approving the project plans and specifications which comprise the approved grading plan, and which professional person appears of record pursuant to AVMC 13.08.130 through 13.08.180 or their successor appearing pursuant to AVMC 13.08.390, Transfer of responsibility for approval.

“Rough grade” is the stage at which the grade approximately conforms to the approved plan.

“Semi-permanent erosion control devices” are devices which are used primarily during construction and are not relocatable. They include earthen berms, concrete spillways, desilting basins, riser/outlet pipes, etc.

“Site” is any lot or parcel of land or contiguous combination thereof, under the same ownership, where grading is performed or permitted.

“Slope” is an inclined ground surface, the inclination of which is expressed as a ratio of horizontal distance to vertical distance.

“Soil” is naturally occurring surficial deposits overlying bedrock.

“Soil engineer” is a civil engineer duly registered in the state of California whose field of expertise is soil mechanics.

“Soil engineering” shall mean the application of the principles of soil mechanics in the investigation, evaluation and design of civil works involving the use of earth materials and the inspection and testing of the construction thereof.

“Special inspector” is an inspector duly licensed by the building official to perform inspection of asphalt concrete placement and related construction work or other grading related work approved by the building official.

“Stormwater permits” are any permits issued by a local, state or federal regulatory agency regulating stormwater flow over and from any project subject to this chapter including but not limited to NPDES permits and state general permits as defined in AVMC 7.35.030.

“Temporary erosion control devices” are devices which are removable. In most cases they will last no longer than one rainy season. They include sandbags, gravel bags, plastic sheeting (visqueen), silt fencing, straw bales, and similar items.

“Terrace” is a relatively level step constructed in the face of a graded slope surface for drainage and maintenance purposes.

“Water quality requirements” are the requirements relevant to activities that are subject to this chapter found in AVMC 7.35.010 et seq., the DAMP as defined in AVMC 7.35.030 including all appendices and guidance documents included in the DAMP, as well as requirements relevant to the activities that are subject to this chapter found in stormwater permits. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-804)].

Cross-reference: definitions generally, AVMC 1.02.010.

Article III. Permits Required

13.08.060 Grading permits.

No person shall conduct any grading, clearing, brushing, or grubbing on natural or existing grade that is preparatory to grading, without first having obtained a grading permit from the building official. Exceptions to this requirement are as follows or as otherwise determined by the building official:

A. An excavation below finished grade for basements and footings of a building, mobilehome, retaining wall, or other structure authorized by a valid building permit or construction permit. This shall not exempt any fill made with the material from such excavation nor exempt any excavation having an unsupported height greater than five feet after the completion of such structure. This shall not prohibit a minimum-fee grading permit or soil or geologic report from being required for foundation design and inspection purposes when, in the opinion of the building official, stability or flooding considerations warrant such inspection.

B. Cemetery graves.

C. Refuse disposal sites controlled by other regulations.

D. Earthwork construction regulated by the federal, state, county, or city governments, or by any local agency as defined by California Government Code Sections 53090 through 53095 (special districts). Pipeline or conduit excavation and backfill conducted by local agencies or public utilities. Earthwork construction performed by railway companies on their operating property. This exemption, however, shall apply only when the earthwork construction takes place on the property, or dedicated rights-of-way or easements of the above agencies.

E. Excavation and backfill for installation of underground utilities by public utilities or companies operating under the authority of a franchise or public property encroachment permit.

F. Mining, quarrying, excavating, processing, stockpiling of rock, sand, gravel, aggregate or clay where established and provided for by law, provided such operations do not affect the lateral support or increase the stresses in or pressures upon any adjacent or contiguous property.

G. Exploratory excavations under the direction of soil engineers or engineering geologists, provided all excavations are properly backfilled. All such excavations and trenches are subject to the applicable sections of Title 8 of the State Orders, Division of Industrial Safety.

H. An excavation which does not exceed 50 cubic yards on any one site and which (1) is less than two feet in vertical depth, or (2) which does not create a cut slope greater than five feet in vertical height and steeper than one and one-half horizontal to one vertical.

I. A fill less than one foot in depth placed on natural grade with a slope flatter than five horizontal to one vertical, which does not exceed 50 cubic yards on any one lot and does not obstruct a drainage course.

J. A fill less than three feet in depth, not intended to support structures or mobilehomes, which does not exceed 50 cubic yards on any one lot and does not obstruct a drainage course. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-805)].

13.08.070 Grading permit – Watercourse alteration.

No person shall alter an existing watercourse, channel, or revetment by excavating, or placing fill, rock protection or structural improvements without a valid grading permit unless waived by the building official or performed as interim protection under emergency flood-fighting conditions. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-807)].

13.08.080 Excavation blasting permit.

No person shall possess, store, sell, transport or use explosives and blasting agents to do any excavation without a permit from the fire authority. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-808)].

13.08.090 Types of grading permits.

A. Either a preliminary grading permit or a precise grading permit may be issued for grading work upon completion of an application in accordance with Subarticle 5 of the grading manual and approval by the building official. The preliminary or precise grading permit is the option of the permittee; provided, that the plans satisfy the requirements of Subarticle 5 of the grading manual.

B. Building permits may be issued for a site grading under a valid precise grading permit upon completion and approval of rough grade inspection as specified in AVMC 13.08.400(E) (site inspection by the building official).

C. Building permits shall not be issued for a site graded under a preliminary grading permit until a new precise grading permit has been issued and the provisions of subsection (B) of this section have been satisfied. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-809)].

Article IV. Organization and Enforcement

13.08.100 Powers and duties of the building official.

A. The provisions of Section 202, Powers and Duties of Building Official, of the Uniform Building Code shall apply to grading construction work.

B. Stop Orders. Whenever any building or grading work is being done contrary to the provisions of this chapter or the grading permit, the building official may order the work stopped by notice in writing served on any persons engaged in the doing or causing such work to be done, and any such persons shall forthwith stop such work until authorized by the building official to proceed with the work.

C. Whenever any building or grading work is being done contrary to the provisions of the water quality requirements related to activities subject to this chapter, in addition to the powers and duties specified in subsections (A) and (B) of this section, the building official may utilize any enforcement provision specified in AVMC 7.35.100 through 7.35.200. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-810)].

13.08.110 Violations and penalties.

A. It shall be unlawful for any person, firm or corporation to do grading in the city or cause the same to be done, contrary to or in violation of any of the provisions of this chapter.

B. The issuance of a building permit, performance of building permit inspections, or issuance of a certificate of use and occupancy may be withheld for property on which a violation of the provisions of this chapter exists, including work performed not in accordance with approved grading plan, until such violation has been corrected or mitigated to the satisfaction of the building official or designee. The building official shall consult, as appropriate, with the director.

C. No tentative tract map or parcel map shall be approved for property on which a violation of the provisions of this chapter exists, including work performed not in accordance with approved grading plans, unless conditioned to require such violation to be corrected or mitigated to the satisfaction of the building official prior to recordation.

D. No zone change or discretionary permit per Chapter 15.74 AVMC shall be approved for property on which a violation of the provisions of this chapter exists, including work performed not in accordance with approved grading plans, unless conditioned to require such violation to be corrected or mitigated to the satisfaction of the building official prior to the issuance of any building permits.

E. The building official, in consultation with the director, shall determine if the corrective or mitigating action itself requires the approval of a site development permit per AVMC 15.74.020 and/or an initial study per CEQA.

F. Any person, firm, or corporation violating any of the provisions of this chapter shall be deemed guilty of a misdemeanor, and each such person shall be deemed guilty of a separate offense for each and every day or portion thereof during which any violation of any of the provisions of this chapter is committed, continued, or permitted, and upon conviction of any such violation such person shall be punishable by a fine of not more than $500.00 or by imprisonment for not more than six months, or by both such fine and imprisonment.

In addition to any such fine or imprisonment, the court may also require such party to correct or mitigate the grading violation to the satisfaction of the building official.

G. Public Nuisance.

1. Any grading performed and/or maintained on any site in the city contrary to, or not in compliance with, the provisions of this chapter shall be and the same is hereby declared to be unlawful and a public nuisance, and any failure, refusal, or neglect to obtain a permit as required by the terms of this chapter shall be prima facie evidence of the fact that a public nuisance has been committed.

2. The city may commence an appropriate civil action to abate a public nuisance and to collect a civil penalty.

3. The civil penalty shall not exceed $250.00 for each day on which such violation occurs and continues to occur. In addition, the civil penalty for violation of an abatement order or stop order shall be $500.00.

4. The abatement of a public nuisance may be made at the expense of the owner of the property on which the nuisance is located. If the city abates the public nuisance, the costs of such abatement shall be charged to the owner of the premises involved.

H. This chapter may also be enforced by injunctive relief, including, but not limited to, temporary restraining orders and preliminary and permanent injunctions issued by the superior court upon suit by the city.

I. In addition to the provisions of the subsections above, a notice of violation of this chapter may be recorded in accordance with the following procedures:

1. Notice of Intent. A written notice of intent to record a notice of violation shall be served on the current owner of record of the property. Such notice shall describe the property, the violation and the action necessary to correct or mitigate the violation. The notice shall inform the owner that a notice of violation will be recorded if the owner does not, within 20 days of receipt thereof, either correct the violation or request a meeting with the building official as set forth below. The notice shall include a copy of this subsection (I) and be substantially as follows:

Notice of Continuing Violation of the City of Aliso Viejo Grading and Excavation Code.

Notice is hereby given that the City of Aliso Viejo has determined that a violation of the above Code exists on the following described property (description). The violation consists of (description).

While a violation of the above Code exists, the City of Aliso Viejo may refuse to approve building or occupancy permits, subdivision maps, use permits, and other discretionary permits and development approvals.

2. Correction of Violation. If, within 20 days of receipt of a notice of intent, the owner corrects the violation, no notice of violation shall be recorded. The building official may grant extensions of time for good cause.

3. Meeting. If the owner requests a meeting, the building official shall schedule a meeting. Notice of the meeting shall be served on the owner no less than 15 days prior thereto. The building official may reschedule the meeting from time to time for a good cause with adequate notice to the landowner. At the meeting, the owner may be represented by counsel and may present any relevant evidence that violations do not exist.

4. Decisions – Notice. Within 30 days following completion of the meeting, the building official shall issue and serve on the owner his determination as to whether or not a notice of violation will be recorded. This determination shall be supported by appropriate findings on all material issues raised at the meeting. The decision of the building official shall be final with respect to recordation of a notice of violation, but shall not affect other proceedings under this section.

5. Recordation. If the building official determines that a notice will be recorded, such notice shall be recorded 15 or more days after service of notice of the decision.

6. Release of Notice. When a violation is corrected or mitigated to the satisfaction of the building official, if a notice of violation had been recorded, the building official shall cause a release to be recorded. Said release shall refer to the notice of violation and shall state that the violation described therein has been corrected.

J. All of the foregoing remedies shall be cumulative and not exclusive, except when otherwise provided. Penalties and/or remedies under this chapter are in addition to and do not supersede or limit any and all other remedies, civil or criminal. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-811)].

Cross-reference: violations and penalties generally, Chapter 1.06 AVMC.

13.08.120 Hazardous conditions.

A. Hazardous conditions exist when the state of any natural ground, natural slopes, excavation, fill or drainage device, all of which exist on private property, is a menace to life or limb, or a danger to public safety, or endangers or adversely affects the safety, usability or stability of adjacent property, structures, or public facilities.

B. The building official may examine or cause to be examined every condition reported as hazardous as set forth in subsection (A) of this section.

C. Notice of Hazardous Condition. In any case where a hazardous condition is found by the building official, he shall give notice, setting forth the finding to all owners of the property affected by the hazardous condition, authorized representative of the owners or a permittee under any active permit which gives permittee control of the property issued pursuant to this chapter hereinafter referred to as “owner” of such required corrective work. The notice may state the time and place of a hearing to be held if the owner fails to comply with any demand for corrective work or reports. The purpose of the hearing would be for the presentation of evidence concerning the hazardous conditions and demand for corrective work or submission of reports. The notice shall set forth the right of the owner to be present at the hearing, at his option, and introduce such relevant evidence on the issues as he desires. If the time and place of any hearing scheduled for the presentation of evidence is not included in the initial notice(s), it shall be included in a subsequent notice.

D. Evidence. At the time and place so specified for the hearing, evidence shall be submitted as to the facts of any condition as to reasonably establish its existence, and the building official or his designee, as hearing officer, shall determine whether the facts presented reasonably establish the existence of a hazardous condition to the satisfaction of the hearing officer. Evidence may further be submitted as to the work or reports considered necessary to correct or determine work to correct said hazard.

E. Order, Finality and Appeal. If the hearing officer determines the existence of a hazardous condition, he shall determine whether such hazards are subject to corrective work and/or the need for more analysis through the preparation of reports and shall order such work or reports and specify a completion time.

1. Finality of Order. The determination and order may be made orally at the hearing and shall be written and transmitted to the owner within a reasonable time. The determination and order shall become final within five days, excluding Saturdays, Sundays and holidays, from the time it is first rendered in the event that the owner was not present at the hearing, within five days of the mailing of the order to the last known address of said owner.

F. Completion of Work. The owner shall, following the finality of the determination and order of the hearing officer, commence the corrective action ordered or preparation of reports and such work or submission shall be completed within the specified time.

G. Failure to Complete Work. If the owner neglects or fails to complete the corrective work or submit the reports ordered by the hearing officer within the specified time, the building official may: (1) cause the work to be performed or reports to be prepared, or (2) advise the owner of the need for corrective work and warn him/her that in the absence of such corrective work, subsequent future hazards may occur which could result in an order to vacate the premises. Nothing in this subsection shall be construed to limit the type of remedy or relief which the building official may have under any other provision of law.

H. Costs. Costs incurred by the city to perform any corrective work or prepare reports under subsection (G) of this section shall be charged to the owner.

I. Vacation of Property. If necessary, the notice and order in subsection (C) or (E) of this section shall include the requirement that the property, a portion thereof or adjacent sites be vacated within a specified time, in the interest of public safety, pending the finality of any determination and order or completion of corrective work.

The building official shall cause the property to be posted at conspicuous locations with a notice containing at least the following:

UNSAFE TO OCCUPY

DO NOT ENTER

Building Official, City of Aliso Viejo

Date Posted _________________

Said posted notice may also contain the date, time and place of the hearing and the name, address and telephone number of the office or building official where additional information may be obtained.

Such posted notices shall remain posted until any necessary corrective work is completed. Such posted notices shall not be removed without written permission of the building official, and no person shall enter the property except for the purpose of making the required corrections or preparing reports.

J. Service of Notices. The notice and order required by subsections (C) and (E) of this section may be served either:

1. By mailing a copy by certified mail, return receipt requested, to the owner’s address as designated on papers, applications, or permits on file with the building official; or

2. By personally delivering a copy to the owner’s address as designated on papers, applications or permits on file with the building official; or

3. If the owner is absent from his place of residence and from his usual or designated place of business, by leaving a copy with some person of suitable age and discretion at either place, and sending a copy by certified mail, return receipt requested, addressed to the owner or authorized representative at his place of residence; or

4. If such place of residence and business cannot be ascertained, or a person of suitable age or discretion there cannot be found, then by affixing a copy in a conspicuous place on the property, building, or structure and also delivering a copy to a person there residing, if any, or to the person in charge, if any; and also sending a copy by certified mail, return receipt requested, addressed to the owner at the place where the property, building or structure is situated, or to the owner at his last known or designated address, or both. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-812)].

Article V. Grading Permit Requirements

13.08.130 Permits required.

Except as exempt in AVMC 13.08.060, no person shall conduct any grading or clearing, brushing, or grubbing on natural grade or existing grade that is preparatory to grading, without first obtaining a grading permit from the building official. A separate permit shall be required for each site and may cover both excavations and fills. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-815)].

13.08.140 Application.

A. To obtain a grading permit, the applicant must first file an application in writing on a form furnished by the building official.

The grading permit application shall be accompanied by information required by the building official and as specified in Subarticle 5 of the grading manual. Each application for a grading permit for a construction site required to be covered under the state general construction stormwater permit (“GCSP”) shall include proof of the filing of a notice of intent with the State Water Resources Control Board.

B. Applications for which no grading permit is issued within 180 days following the date of application shall expire by limitation and plans submitted for checking may thereafter be returned to the applicant or destroyed by the building official. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. In order to renew action for an application after expiration, the applicant shall resubmit plans and pay a new plan check fee. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-816)].

13.08.150 Plans and specifications.

A. Each application for a grading permit shall be accompanied by plans and specifications, and supporting data consisting of soil engineering and engineering geology reports when required by the building official, as specified in AVMC 13.08.170, Soil engineering and engineering geology reports.

B. Plans and specifications for earthwork projects of 5,000 cubic yards or more, and/or subdivisions and hillside commercial, industrial and multi-residential projects shall be prepared and signed by the building official. This requirement may be extended to any project when, in the opinion of the building official, critical drainage or geologic factors may be involved and there is need for civil engineering design and control. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-817)].

13.08.160 Information on plans and specifications.

Grading plans and specifications shall be prepared in accordance with the grading requirements of AVMC 13.08.370(A) (grading requirements), and Subarticle 5 of the grading manual. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-818)].

13.08.170 Soil engineering and engineering geology reports.

A soil engineering and engineering geology report shall be required for grading projects, unless otherwise waived by the building official. The reports shall include information appropriate for the site including any information required by the building official. Recommendations included in the reports and approved by the building official shall be incorporated in the grading plans or specifications. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-819)].

13.08.180 Issuance, expiration and renewal.

A. Every permit issued shall be valid for a period of two years from the date of issuance.

B. Every permit issued shall expire by limitation and become null and void if the work authorized by such permit is not commenced within 180 days from the date of such permit or if the work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days.

C. The time limitations and provisions of Section 303, Permits issuance, of the Uniform Building Code as amended are applicable to grading permits, except as stated in subsections (C)(1) and (2) of this section:

1. A permit issued hereunder shall expire upon a change of ownership if the grading work thereon, for which said permit was issued, has not been completed, and a new permit shall be required for the completion of the work. If the time limitations of subsections (A) and (B) of this section are not applicable and if no changes have been made to the plans and specifications last submitted to the building official, no charge shall be made for the issuance of the new permit under such circumstances. If, however, changes have been made to the plans and specifications last submitted to the building official, fees based on the valuation of the additional work, additional yardage and necessary plan checking as provided for in Subarticle 6 of the grading manual shall be charged to the permit applicant.

2. The building official may extend the 180-day expiration time limit on permits not to exceed two successive periods of 180 days each upon written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken.

D. The building official may require that grading operations and project designs be modified if delays occur which incur weather-related problems not considered at the time the permit was issued, and further subject to the provisions of AVMC 13.08.190, Denial of permit.

E. If the permittee presents satisfactory reasons for failing to continue or begin the work within the period specified in subsection (B) of this section, the building official, upon receiving a written request, may grant an extension of time as specified in subsection (C)(2) of this section without additional fees; provided, that:

1. No changes have been made in the original plans and specifications for such work.

2. Suspension or abandonment has not exceeded one year.

3. A re-endorsement of the compliance of the plans with the applicable regulations by the city shall be obtained.

Such request for extensions must be submitted no later than the sixtieth day following the date on which said permit would otherwise expire. If the permittee fails to request an extension within the time provided, the building official may renew the grading permit for a fee of one-half the amount required for the original permit provided no changes have been made in the original plans and specifications for such work.

F. If the permittee is unable to complete the work by the end of a two-year period, the building official may renew the grading permit on an annual basis for a fee of one-half the amount required for the original permit for such work, provided no changes have been made in the original plans and specifications for such work. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-820)].

13.08.190 Denial of permit.

A. The building official shall not issue a grading permit in any case where the building official finds that the work as proposed by the applicant is liable to constitute a hazard to property or result in the deposition of debris on any public way or interfere with any existing drainage course. If it can be shown to the satisfaction of the building official that the hazard can be essentially eliminated by the construction of retaining structures, buttress fills, drainage devices or by other means, the building official may issue the grading permit with the condition that such work be performed.

B. If, in the opinion of the building official, the land area for which grading is proposed is subject to geological or flood hazard to the extent that no reasonable amount of corrective work can eliminate or sufficiently reduce the hazard to human life or property, the grading permit and the building permits for habitable structures shall be denied.

C. The building official may require plans and specifications to be modified in order to mitigate anticipated adverse environmental effects of proposed grading projects. The building official may, under circumstances where the significant adverse environmental effects of a proposed grading project cannot be mitigated, deny the issuance of a grading permit.

D. The building official may require plans and specifications to be modified in order to make them consistent with the city of Aliso Viejo general plan, specific plans, zoning code, water quality requirements or other rules, regulations, or conditions applicable to the project. The building official may deny the grading permit if the proposed project cannot be designed in accordance with these rules, regulations or conditions. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-821)].

13.08.200 Time of grading operations.

Grading and equipment operations within one-half mile of a structure for human occupancy shall not be conducted between the hours of 8:00 p.m. and 7:00 a.m. nor on Sundays and federal holidays. The building official may, however, permit grading or equipment operations during specific hours after 8:00 p.m. or before 7:00 a.m. or on Sundays and federal holidays if he determines that such operations are not detrimental to the health, safety, or welfare of the inhabitants of such a structure. Permitted hours of operation may be shortened by the building official’s finding of a previously unforeseen effect on the health, safety, or welfare of the surrounding community. However, no permit that has been issued, nor any provision of this section shall be construed to be a waiver of the applicability of the provisions set forth in this code or city ordinance related to noise control, including Chapter 8.12 AVMC. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-822)].

13.08.210 Responsibility of permittee.

A. It shall be the responsibility of the permittee to be knowledgeable of the conditions and/or restrictions of the grading permit as outlined in applicable sections of this chapter, the grading manual, and as contained on the approved grading plans and in the approved soil and geology reports. The permittee shall also be responsible to maintain in an obvious and accessible location on the site, a copy of the grading plans bearing the stamp of approval by the building official.

B. All grading permits, waivers or exemptions issued hereunder shall be deemed to include the provisions that the permittee, the permittee’s agents, contractors and employees shall carry out the proposed work in accordance with the approved plans and specifications, where such approval is required, and in accordance with any applicable water quality requirements prepared and maintained pursuant to federal or state requirements or a city directive, and in compliance with all requirements of the permit and this chapter. Failure to carry out the work in accordance with approved plans and specifications, the applicable water quality requirements, and in compliance with all requirements of the permit and this chapter shall be a violation of this chapter. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-823)].

13.08.220 Protection of adjoining property.

Each adjacent owner is entitled to the lateral and subjacent support which his land receives from the adjoining land, subject to the right of the owner of the adjoining land to make proper and usual excavations on the same for purposes of construction or improvement as provided by law. California Civil Code Section 832 is contained in Appendix G of the grading manual. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-824)].

13.08.230 Import and export of earth material.

Where an excess of 5,000 cubic yards of earth per project site is moved on public roadways from or to the site of an earth grading operation, all of the following requirements shall apply:

A. Either water or dust palliative or both must be applied for the alleviation or prevention of excessive dust resulting from the loading or transportation of earth from or to the project site on public roadways. The permittee shall be responsible for maintaining public rights-of-way used for handling purposes in a condition free of dust, earth, or debris attributed to the grading operation.

B. Loading and transportation of earth from or to the site must be accomplished within the limitations established in AVMC 13.08.200.

C. Access roads to the premises shall be only at points designated on the approved grading plan. A method of containing dirt and debris on site must be installed on each access road at a point prior to the limits of the public road.

D. The last 50 feet of the access road, as it approaches the intersection with the public roadway, shall have a grade not to exceed three percent. There must be 300 feet clear, unobstructed site distance to the intersection from both the public roadway and the access road. If the 300 feet sight distance cannot be obtained, flagman shall be posted.

E. A stop sign conforming to the requirements of the California Vehicle Code shall be posted at the entrance of the access road to the public roadway.

F. An advance warning sign must be posted on the public roadway 400 feet on either side of the access intersection, carrying the words “truck crossing.” The sign shall be diamond shape, each side being 30 inches in length, shall have a yellow background, and the letters thereon shall be five inches in height. The sign shall be placed six feet from the edge of the pavement and the base of the sign shall be five feet above the pavement level. The advance warning sign shall be covered or removed when the access intersection is not in use. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-825)].

Article VI. Fees

13.08.240 Grading plan check fees.

Before accepting a grading permit application and plans and specifications for checking, the building official shall collect a plan-checking fee as approved by resolution of the city council and as provided in Subarticle 6 of the grading manual. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-826)].

13.08.250 Grading permit fees.

A. A fee for each grading permit shall be paid to the building official prior to issuance of a grading permit as approved by resolution of the city council and as provided in Subarticle 6 of the grading manual.

B. Failure to pay fees and obtain a permit before commencing work shall be deemed a violation of this chapter, except when it can be proven to the satisfaction of the building official that an emergency existed which made it impractical to first obtain the permit. A violation shall result in an assessment of double permit fees for work done prior to permit issuance. Payment of a double fee shall not relieve any person from fully complying with the requirements of this chapter nor from any other penalties prescribed herein.

C. Additional fees approved by resolution of the city council and contained in Subarticle 6 of the grading manual shall be paid as required to the building official. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-827)].

13.08.260 Cost recovery fees.

If the building official performs emergency work on private property, he shall charge the property owner all direct and indirect costs which are necessary to complete the work to his satisfaction. In addition, the building official may charge a mobilization cost equal to 10 percent of the cost for performing the work. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-828)].

Article VII. Security

13.08.270 Grading permit security.

A. Grading Permit Security Required – Exceptions. A grading permit shall not be issued unless the permittee shall first post with the building official grading permit security in a form and amount set forth in the grading manual. The grading permit security is required to assure that the work, if not completed in accordance with approved plans and specifications, will be corrected to eliminate hazardous conditions and/or correct conditions that pose a threat to environment resources including but not limited to a threat to water quality. This requirement may be waived at the discretion of the building official if the building official determines that:

1. No hazardous situation is likely to occur as a result of incomplete or improper grading; or

2. No adverse effect is likely to occur to subject property, adjacent property or an existing or proposed structure thereon as a result of incomplete or improper grading; or

3. No significant drainage, erosion, flooding or siltation problems will exist as a result of incomplete or improper grading; or

4. No adverse geological or environmental impacts will occur as a result of incomplete or improper grading; or

5. No conditions of the grading permit warrant a financial guarantee to assure their satisfactory completion.

B. Multiple Projects. On developments where progressive individual grading projects or several concurrent projects are being constructed by one owner, a continuing (blanket) form of grading permit security which will cover all such projects may be accepted and the amount determined by the building official.

C. Additional Grading Permit Security. Additional grading permit security in an amount determined by the building official may be required to ensure the completion of finish grading under the grading permit as a condition of occupancy and energizing utilities. Grading permit security in an amount determined by the building official may be required for grading permits involving temporary earthen stockpiles to ensure their timely removal.

D. Failure to Complete Work. In the event of failure to comply with all of the conditions and terms of the grading permit, the building official may order the work authorized by the grading permit to be completed or put in a safe condition to the building official’s satisfaction.

E. Default in Performance of Conditions. Whenever the building official finds or determines that a default has occurred in the performance of any requirement of a condition of a grading permit, or there is a failure to comply with an order issued pursuant to subsection (D) of this section, written notice thereof shall be given to the permittee and, when applicable, to the surety on the bond or other security. Such notice shall specify the work to be done, the estimated cost thereof and the period of time deemed by the building official to be reasonably necessary for the completion. After receipt of such notice, the permittee and, if applicable, surety, shall within the time specified, cause or require the work to be performed. If the work is not performed, the estimated cost of performing the work shall be demanded from the surety or, if there is no surety, obtained from the security, and the building official shall cause such work to be performed and completed. The cost of the work shall include a mobilization charge as specified in AVMC 13.08.260. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-829)].

Article VIII. Cuts

13.08.280 Cuts.

A. Cut slopes shall be no steeper than two horizontal to one vertical (2:1) unless otherwise recommended in the soil engineering or engineering geology report and approved by the building official. The slope of cut surfaces shall be no steeper than is safe for the intended use. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-830)].

Article IX. Fills

13.08.290 Fills.

A. Unless otherwise approved by the building official and recommended in the approved soil engineering report, fills shall conform to Subarticle 9 of the grading manual. The provisions therein may be waived for minor fills not intended to support structures upon written request by the applicant on a form prescribed by the building official.

B. The building official may require that the soil tests or testing be performed by an approved testing laboratory.

C. Fill slopes shall be no steeper than two horizontal to one vertical (2:1) unless otherwise recommended in the soil engineering report and approved by the building official. The slope of fill surface shall be no steeper than is safe for the intended use. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-831)].

Article X. Setbacks

13.08.300 Setbacks.

The setbacks and other restrictions specified by Subarticle 10 of the grading manual are minimum and may be increased by the building official or by the recommendation of a civil engineer, soil engineer or engineering geologist, if necessary for safety and stability or to prevent damage to structures of adjacent properties from sediment disposition, erosion, water runoff of the slopes or to provide access for slope and drainage structure maintenance. The minimum setback may be reduced only in special circumstances where stability is proven to the satisfaction of the building official by the soil engineer or engineering geologist and other factors are of primary importance. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-832)].

Article XI. Drainage and Terracing

13.08.310 Conformance to grading manual.

Drainage facilities and terracing shall conform to the provisions of Subarticle 11 of the grading manual unless otherwise approved by the building official and delineated on the approved grading plan. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (Subart. XI)].

Article XII. Asphalt Concrete Pavement

13.08.320 Asphalt concrete pavement.

A. Asphalt concrete pavement for surfacing of parking lots, private streets or other similar use shall conform to the provisions of Subarticle 12 of the grading manual unless otherwise approved by the building official.

B. The site soil engineer or special inspector shall inspect the construction of asphalt paved areas and verify to the building official that the work has been performed in compliance with the provisions of this section. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-834)].

Article XIII. Erosion Control

13.08.330 Erosion control and water quality requirement systems.

A. The faces of cut and fill slopes and project sites shall be prepared and maintained to control against erosion in accordance with this section. Where cut slopes are not subject to erosion due to the erosion-resistant character of the materials, such protection may be omitted upon approval by the building official.

B. Where necessary, temporary and/or permanent erosion control devices such as desilting basins, check dams, riprap or other devices or methods, as approved by the building official, shall be employed to control erosion and provide safety during the rainy season from October 1st to April 30th.

C. No grading work in excess of 200 cubic yards will be allowed between October 1st and April 30th on any single grading site under permit unless an erosion control system has been approved or waived by the building official.

D. Paved streets, sidewalks, and other improvements shall be maintained in a neat and clean condition free of loose soil, construction debris and trash. Street sweeping or other equally effective means shall be used on a regular basis to prevent storm flows from carrying sediment and debris outside the project boundaries. Watering shall not be used to clean streets except for fine material (not otherwise removed by sweeping or other mechanical means) unless the water is vacuumed from the street and disposed of in a manner acceptable to the building official.

E. Unless otherwise approved by the building official, the owner shall be required to retain a civil engineer who will be responsible for the design of all erosion and sediment control improvements and initial approval of the installation of permanent and semi-permanent erosion control devices during each rainy season until the work authorized by the grading permit is given final approval. The owner shall retain the civil engineer to periodically review the field condition and modify, as needed, the design of the permanent and semi-permanent erosion and sediment control devices during the rainy season. Installation and maintenance of all erosion and sediment control devices shall be the responsibility of the owner.

F. Desilting facilities shall be provided at drainage outlets from the graded site.

G. Desilting basins shall be designed to provide a minimum desilting capacity equal to the current city standards.

H. Desilting basins shall be constructed around the perimeter of projects whenever feasible.

I. Desilting basins constructed of compacted earth shall be compacted to a relative compaction of 90 percent of maximum density. A soil engineering report, prepared by the soil engineer, which includes the type of field testing performed, location and results of testing shall be submitted to the building official for approval upon completion of the desilting basins.

J. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on-site and stockpiled at convenient locations to facilitate rapid construction of temporary devices when rain is imminent.

K. Erosion protection shall consist of effective planting of all slopes in excess of five feet high unless otherwise approved by the building official. Slopes exceeding 15 feet high may require an adequate irrigation system, as determined by the building official.

Protection for the slopes shall be installed as soon as practicable which may be prior to rough grade approval. Effective planting shall be installed, fully germinated and effectively cover the required slopes prior to final approval unless otherwise approved by the building official.

L. The erosion control provisions shall take into account drainage patterns during the current and future phases of grading throughout the rainy season.

M. All removable protective devices shown shall be in place at the end of each working day when the five-day rain probability forecast exceeds 40 percent.

N. Graded areas around the tract perimeter must drain away from the face of slopes at the conclusion of each working day.

O. In addition to the requirements specified above, the permittee shall perform all work in accordance with the water quality requirements. The building official may include additional requirements in the grading permit or any other permit issued by the building official, outside the rainy season defined in subsection (B) of this section, that the building official deems necessary to assure compliance with water quality requirements including but not limited to measures affecting construction outside the rainy season defined in subsection (B) of this section and/or grading permits.

P. Any violation of an applicable federal or state-issued stormwater permit, or failure to conform to the water quality requirements prepared pursuant to such a permit or pursuant to this chapter or to AVMC 7.35.010 et seq., or failure to comply with stormwater-related provisions of a county-issued grading permit or of a grading plan prepared to secure such a permit, is also a violation of this chapter. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-835)].

13.08.340 Erosion control plans.

Erosion control plans prepared in accordance with Subarticle 13 of the grading manual shall be submitted to the building official for approval by September 15th each year for projects under grading permit. The erosion control plan may be waived for grading projects on single residential lot projects providing that an erosion control system, meeting the approval of the building official, has been installed, placed, planted or constructed before October 15th. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-836)].

13.08.350 Erosion and sediment control and water quality requirement system maintenance.

A. After each rainstorm, silt and debris shall be removed from all erosion and sediment control devices and the basins pumped dry as deemed necessary by the building official. The pumped material shall be deposited in a manner acceptable to the building official.

B. After each rainstorm, the performance of the erosion control system shall be evaluated and revised and repaired as necessary.

C. Devices shall not be moved or modified without the approval of the building official.

D. The contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where impounded water creates a hazardous condition.

E. The contractor and permittee or project owner shall be responsible for continual maintenance of the devices during the rainy season. In the event of failure or refusal by the contractor, permittee or project owner to properly maintain the devices, the building official may cause emergency maintenance work to be done to protect adjacent private and public property and environmental resources. The cost shall be charged to the owner and shall include an initial mobilization cost plus the cost of doing the work as contained in Article VI of this chapter.

F. In the event the building official must cause emergency maintenance work to be done, the building official may revoke the grading permit in writing. The grading permit shall not be renewed until an erosion control system and/or other systems necessary to comply with water quality requirements approved by the building official are installed and a fee of one-half the amount required for the original grading permit is paid by the owner. The building official may waive installation of an erosion control system after April 30th.

G. If any grading subject to AVMC 13.08.060 has commenced on private property without a valid grading permit, the property owner may be required to prepare and implement an erosion control plan as well as other plans required under the water quality requirements which have been approved by the building official. In the event of failure by the property owner to install an approved erosion control system and/or other systems necessary to comply with water quality requirements, the building official may cause emergency work to be done to protect adjacent private and public property. The procedures of AVMC 13.08.120 need not apply for emergency erosion control work between October 1st and April 30th and emergency work necessary to protect environmental resources. The cost shall be charged to the owner in accordance with subsection (E) of this section. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-837)].

Article XIV. Grading Inspection

13.08.360 General.

All grading operations for which a permit is required shall be subject to inspection by the building official. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-838)].

13.08.370 Grading requirements.

A. It shall be the responsibility of the civil engineer, architect or other qualified individual who prepares the grading plan approved by the building official to incorporate all recommendations from the soil engineering and engineering geology reports into the grading plan. The civil engineer shall also be responsible for the professional inspection and approval of the grading within the civil engineer’s area of technical specialty. This responsibility shall include, but need not be limited to, inspection and approval as to the establishment of line, grade and drainage of the development area. The project civil engineer and/or general contractor shall act as the coordinating agent in the event the need arises for liaison between the project professional grading contractor and the building official. The civil engineer or other qualified person who prepares and signs the grading plan shall also be responsible for the preparation of revised plans, erosion control plans, and the submission of as-graded grading plans when required by the building official upon completion of the work.

B. Soil engineering and engineering geology reports shall be required as specified in AVMC 13.08.170. During grading, all necessary reports, compaction data, soil engineering and engineering geology recommendations shall be submitted to the owner by the soil engineer and engineering geologist. The owner shall submit copies of the report to the civil engineer and two copies of all reports to the building official.

C. The soil engineer’s area of responsibility shall include, but need not be limited to, the professional inspection and approval concerning the preparation of ground to receive fills, testing for required compaction, stability of all finish slopes, design of buttress fills, subdrain installation and incorporation of data supplied by the engineering geologist.

D. The engineering geologist’s area of responsibility shall include, but need not be limited to, professional inspection and written approval of the adequacy of natural ground for receiving fills, the stability of cut slopes with respect to geological matters, and the need for subdrains or other groundwater drainage devices. The engineering geologist shall report the engineering geologist’s findings to the soil engineer and the civil engineer for engineering analysis.

E. The building official may expeditiously inspect the project at the various stages of work requiring approval and at any more frequent intervals necessary to determine that adequate control is being exercised by the professional consultants.

F. When preliminary soil engineering reports are not required by the building official, the building official may require inspection and testing by an approved testing agency. The testing agency’s responsibility shall include, but need not be limited to, approval of cleared areas and benches to receive fill, and the compaction of fills.

G. The building official shall not issue any grading permit, waiver, or exemption pursuant to this chapter unless the building official finds that the work authorized by the grading permit, waiver or exemption complies with applicable water quality requirements. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-839)].

13.08.380 Notification of noncompliance.

If, in the course of fulfilling their responsibility under this chapter, the civil engineer, the soil engineer, the engineering geologist, or the testing agency finds that the work is not being done in conformance with the provisions of the approved specifications and grading plans, the discrepancies shall be reported immediately in writing to the person in charge of the grading work and to the building official. Recommendations for corrective measures, if necessary, shall be submitted to the owner. The owner shall submit two copies of all recommendations and reports to the building official. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-840)].

13.08.390 Transfer of responsibility for approval.

If the civil engineer, the soil engineer, the engineering geologist, the testing agency, or the grading contractor of record are changed during the course of the work, the work shall be stopped unless: (A) the owner submits a letter of notification verifying the change of the responsible professional, and (B) the new responsible professional submits in writing that he has reviewed all prior reports and/or plans (specified by date and title) and work performed by the prior responsible professional and that he concurs with the findings, conclusions, and recommendations, and is satisfied with the work performed. He may modify or revise recommendations, specifications, or work performed if accompanied by supporting data and approved by the building official. He must state that he assumes all responsibility within his purview as of a specified date. All exceptions must be justified to the satisfaction of the building official.

Exception: Where clearly indicated that the firm, not the individual engineer and/or geologist, is the contracting party, the designated engineer or geologist may be reassigned and another engineer and/or geologist within the firm may assume responsibility. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-841)].

13.08.400 Site inspection by the building official.

A. Prior to the approval of any building or grading plans and specifications, the building official may inspect the site to determine that the plans and specifications are current and reflect existing conditions.

B. The permittee or his agent shall notify the building official when the grading operations for which inspection is required are ready for inspection.

C. If the inspector finds the soil or other conditions not as stated in the approved plans and soil or geology reports or as in additional information which was required for issuance of the grading permit, he may, using reasonable judgment, refuse to allow further work until approval is obtained for a revised grading plan which will conform to the conditions.

D. The provisions of Section 202(d), Orders, of the Uniform Building Code shall apply to all grading work and whenever the building official determines that any work does not comply with the terms of a permit, or this chapter, or that the soil or other conditions are not as stated on the permit, he may order the work stopped by notice in writing served on any persons engaged in doing or causing of such work to be done and any such persons shall forthwith stop such work until authorized by the building official to proceed with the work.

E. Prior to the issuance of building permits for a graded site, the rough grading shall be completed in accordance with applicable requirements and to the satisfaction of the responsible civil engineer or architect, engineering geologist, soil engineer, and the building official.

F. Whenever any work on which inspections are required is covered or concealed by additional work without first having been inspected, the building official may require by written notice that such work be exposed for examination. The work of exposing and recovering shall not entail or be subject to expense by the city. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-842)].

13.08.410 Special inspections.

The building official may establish special inspection requirements in accordance with Chapter 7, Special Inspections, of the Uniform Building Code, as amended for special cases involving grading- or paving-related operations. Special cases may apply to work where in the opinion of the building official it is necessary to supplement the resources or expertise available for inspection. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-843)].

Article XV. Completion of Work

13.08.420 Final reports.

Upon completion of the rough grading work and at the final completion of the work, the building official may require the written approvals, reports, drawings and supplements thereto specified in Subarticle 15 of the grading manual. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-844)].

13.08.430 Notification of completion.

The permittee or his agent shall notify the building official when the grading operation is ready for final inspection. All work including installation of all drainage facilities and their protective devices and all erosion control measures must be completed in accordance with the final approved grading plan and the required reports approved by the building official before final approval of the grading permit is given by the building official. He may approve the grading work prior to completion of all work in special cases of extreme hardship and if no hazard exists and adequate security is posted to assure completion of all remaining work. [Ord. 2010-126 § 1 (Exh. A); Ord. 2003-044 § 2 (7-1-845)].


1

Cross-references: stormwater management, Chapter 7.35 AVMC; storm drains, Chapter 7.40 AVMC; encroachment and work in the public right-of-way, Chapter 10.04 AVMC; building regulations, Chapter 13.02 AVMC; subdivision standards of design, Chapter 14.10 AVMC.