Chapter 3.25
FIRE PREVENTION AND INVESTIGATION DEPARTMENT FEES
Sections:
3.25.020 Administration of fee schedule.
3.25.010 Fee schedule.
SITE/BUILDING PLAN REVIEW AND INSPECTION FEES |
FEE |
---|---|
Site and building plan review for fire flow |
$75.00 |
Fire final inspection (fire protection credits) |
$75.00 |
FIRE SYSTEM PERMIT FEE Required after review and before release of permit |
FEE |
---|---|
Fire alarm plan review and inspection |
$250.00 |
Each pull station, smoke and heat detector and signaling device |
$3.00 |
|
|
Fire sprinkler plan review and inspections NFPA 13 |
$400.00 |
Each sprinkler head |
$3.00 |
Fire sprinkler plan review and inspection NFPA 13D, 13R and P2904 |
$250.00 |
Each sprinkler head |
$3.00 |
|
|
Fire sprinkler system underground supply piping, fire hydrant, dry hydrant and standpipes plan review and inspection |
$150.00 |
|
|
Hood and duct fire extinguishing system plan review and inspection |
$150.00 |
Each nozzle |
$5.00 |
|
|
Fuel tank removal, first tank |
$150.00 |
Fuel tank removal, each additional |
$100.00 |
Storage tank installation, first tank |
$300.00 |
Storage tank installation, each additional |
$100.00 |
Public fireworks display |
$100.00 |
OPERATIONAL PERMIT FEE (IFC Section 105.6) permits for use and valid for a limited time |
FEE |
---|---|
Special Amusement Buildings |
$100.00 operational permit fee |
Aviation Facilities |
$100.00 operational permit fee |
Cryogenic Fluids |
$100.00 operational permit fee |
Flammable and Combustible Liquids |
$100.00 operational permit fee |
Hazardous Materials |
$100.00 operational permit fee |
High-Piled (combustible) Storage |
$100.00 operational permit fee |
Mobile Food Preparation Vehicles (food trucks, trailers, carts) |
$100.00 per truck, trailer or cart |
Plant Extraction Systems |
$200.00 operational permit fee |
Spraying or Dipping (paint spray/finishing booths or rooms applying flammable or combustible liquids, powders) |
$100.00 operational permit fee |
Tents and Membrane Structures (750 sq. ft. or more size with an occupant load of 50 or more) |
$50.00 per tent/membrane structure for temporary condition less than 180 days |
INSPECTIONS AND TESTING FEES |
FEE |
After-Hours (when staffing allows) |
$75.00 per hour Minimum of 2 hours |
Reinspection |
$75.00 |
(Res. 2023-32 (Exh. A), 3/21/23; Res. 2021-152 (Exh. B), 12/14/21; Res. 2018-14 (Exh. A)(part), 2/27/18).
3.25.020 Administration of fee schedule.
No application will be considered complete and permit processing not commenced until the appropriate fees have been received. Fees required for planning review of permits and appeals of decisions in nonpermit services are payable prior to the services being rendered. Each action for which a fee is listed in Section 3.25.010 will require a separate fee. Projects that involve a number of actions or permits will need to remit the total of the various fees before a determination of completeness is issued and processing begins. (Res. 2018-14 (Exh. A)(part), 2/27/18).
3.25.030 Other fees.
Other fees required in conjunction with the above applications (i.e., taxes, recording fees, etc.) are not included. (Res. 2018-14 (Exh. A)(part), 2/27/18).
3.25.040 Refund policy.
Full or partial requests for refunds of application fees paid must be made in writing to the board of county commissioners. The board of county commissioners has the sole authority to approve or reject such requests. (Res. 2018-14 (Exh. A)(part), 2/27/18).