3.25.010 Fee schedule.

   

Chelan County Fire Marshal’s Office
Proposed 2023 Fee Schedule

SITE/BUILDING PLAN REVIEW AND INSPECTION FEES

FEE

Site and building plan review for fire flow

$75.00

Fire final inspection (fire protection credits)

$75.00

FIRE SYSTEM PERMIT FEE

Required after review and before release of permit

FEE

Fire alarm plan review and inspection

$250.00

Each pull station, smoke and heat detector and signaling device

$3.00

 

 

Fire sprinkler plan review and inspections

NFPA 13

$400.00

Each sprinkler head

$3.00

Fire sprinkler plan review and inspection

NFPA 13D, 13R and P2904

$250.00

Each sprinkler head

$3.00

 

 

Fire sprinkler system underground supply piping, fire hydrant, dry hydrant and standpipes plan review and inspection

$150.00

 

 

Hood and duct fire extinguishing system plan review and inspection

$150.00

Each nozzle

$5.00

 

 

Fuel tank removal, first tank

$150.00

Fuel tank removal, each additional

$100.00

Storage tank installation, first tank
Fuel and firefighting water (per fire protection credits)

$300.00

Storage tank installation, each additional
Fuel and firefighting water (per fire protection credits)

$100.00

Public fireworks display

$100.00

OPERATIONAL PERMIT FEE

(IFC Section 105.6) permits for use and valid for a limited time

FEE

Special Amusement Buildings

$100.00 operational permit fee

Aviation Facilities

$100.00 operational permit fee

Cryogenic Fluids

$100.00 operational permit fee

Flammable and Combustible Liquids

$100.00 operational permit fee

Hazardous Materials

$100.00 operational permit fee

High-Piled (combustible) Storage

$100.00 operational permit fee

Mobile Food Preparation Vehicles

(food trucks, trailers, carts)

$100.00 per truck, trailer or cart

Plant Extraction Systems

$200.00 operational permit fee

Spraying or Dipping (paint spray/finishing booths or rooms applying flammable or combustible liquids, powders)

$100.00 operational permit fee

Tents and Membrane Structures

(750 sq. ft. or more size with an occupant load of 50 or more)

$50.00 per tent/membrane structure for temporary condition less than 180 days

INSPECTIONS AND TESTING FEES

FEE

After-Hours (when staffing allows)

$75.00 per hour

Minimum of 2 hours

Reinspection

$75.00

(Res. 2023-32 (Exh. A), 3/21/23; Res. 2021-152 (Exh. B), 12/14/21; Res. 2018-14 (Exh. A)(part), 2/27/18).

3.25.020 Administration of fee schedule.

No application will be considered complete and permit processing not commenced until the appropriate fees have been received. Fees required for planning review of permits and appeals of decisions in nonpermit services are payable prior to the services being rendered. Each action for which a fee is listed in Section 3.25.010 will require a separate fee. Projects that involve a number of actions or permits will need to remit the total of the various fees before a determination of completeness is issued and processing begins. (Res. 2018-14 (Exh. A)(part), 2/27/18).

3.25.030 Other fees.

Other fees required in conjunction with the above applications (i.e., taxes, recording fees, etc.) are not included. (Res. 2018-14 (Exh. A)(part), 2/27/18).

3.25.040 Refund policy.

Full or partial requests for refunds of application fees paid must be made in writing to the board of county commissioners. The board of county commissioners has the sole authority to approve or reject such requests. (Res. 2018-14 (Exh. A)(part), 2/27/18).